Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Paver Road From 1 Haribandha Pradhan House To Sri Khageswar Sahoo House At Gayatri Ngar, Khaliabandha,2 Putibandha Village To Souvanior School Putibandh, 3 Road From Trilochan Sahoo House To Debabrata Dasg House, Putibandh (Saty
|
Description |
Construction Of Paver Road From 1 Haribandha Pradhan House To Sri Khageswar Sahoo House At Gayatri Ngar, Khaliabandha,2 Putibandha Village To Souvanior School Putibandh, 3 Road From Trilochan Sahoo House To Debabrata Dasg House, Putibandh (Saty
|
Organisation | Government of Odisha |
Tender Id | 2023_ORULB_94601_28 |
Reference Number |
16/SMC_SBP/2023-24 |
Tender Fee | 6000 |
EMD | 35241 |
Tender Value | |
Place | SAMBALPUR MUNICIPAL CORPORATION, SAMBALPUR |
Link | https://tendersodisha.gov.in |
Start Date | September 22, 2023 16:30 |
End Date |
06/10/2023 ( Expired 622 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of rcc drain from ramji vishwakarma house to hari tiwari house at ward no.37 chandawal
Construction of rcc drain from ramji vishwakarma house to hari tiwari house at ward no.37 chandawal
Read moreConsultancy services for authoritys engineer for supervision of construction of road from bile migging section of frontier highway nh 913 km 0.00 from migging end to 17.812 17.812 km km 17.812 to 55.377 migging end 37.565 km km 0.000 at bile end to
Consultancy services for authoritys engineer for supervision of construction of road from bile migging section of frontier highway nh 913 km 0.00 from migging end to 17.812 17.812 km km 17.812 to 55.377 migging end 37.565 km km 0.000 at bile end to
Read moreConstruction of service road at katulboard from nehru nagar to urla of nh-53 from ch.309.940 to 312.250 on lhs and ch. 309.940 to 311.630 on rhs in the state of chhattisgarh
Construction of service road at katulboard from nehru nagar to urla of nh-53 from ch.309.940 to 312.250 on lhs and ch. 309.940 to 311.630 on rhs in the state of chhattisgarh
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreRectification of 01 nos. blackspots (bhutpura) on chittorgarh udaipur section and construction of new 2l elevated ramp at debari interchange on chittorgarh udaipur road section to provide connection from chittorgarh to pindwara
Rectification of 01 nos. blackspots (bhutpura) on chittorgarh udaipur section and construction of new 2l elevated ramp at debari interchange on chittorgarh udaipur road section to provide connection from chittorgarh to pindwara
Read moreConstruction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreof your Industry type