Tender Details
Particulars | Details |
---|---|
Title |
Rectification Works To The Existing Damaged Bt Road From Wicket Gate To Type Iv Block No 1 At Camp I Thermal Nagar
|
Description |
Rectification Works To The Existing Damaged Bt Road From Wicket Gate To Type Iv Block No 1 At Camp I Thermal Nagar
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_505730_1 |
Reference Number |
CE SE C TTPS 254 2024 2025 |
Tender Fee | 0 |
EMD | 13200 |
Tender Value | |
Place | Tuticorin |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=601685 |
Start Date | November 29, 2024 00:25 |
End Date |
14/12/2024 ( Expired 152 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cc road and drain contruction from bhaiyalal kusahwah to manoj kushwah, ward no 1 at nagar parisad badarwas district shivpuri
Cc road and drain contruction from bhaiyalal kusahwah to manoj kushwah, ward no 1 at nagar parisad badarwas district shivpuri
Read moreR and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
R and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
Read moreCement concrete work and other necessary work from gyarah banglow colony gate no. 01 to patrol pump at keshar bagh road mahunaka in ward no. 72 under zone no. 15 (mahapor nidhi)
Cement concrete work and other necessary work from gyarah banglow colony gate no. 01 to patrol pump at keshar bagh road mahunaka in ward no. 72 under zone no. 15 (mahapor nidhi)
Read moreCement concrete work and other necessary work from lokmanya nagar gate no. 01 to utkarsha vihar near garden at keshar bagh road in ward no. 72 under zone no. 15 (mahapor nidhi)
Cement concrete work and other necessary work from lokmanya nagar gate no. 01 to utkarsha vihar near garden at keshar bagh road in ward no. 72 under zone no. 15 (mahapor nidhi)
Read moreCleaning of kachcha/pakka drain from the concrete road in ash bund (west side) to sump no. 02 (north side) in ash bund of stage-i at sstpp, mppgcl, dongalia distt. khandwa.
Cleaning of kachcha/pakka drain from the concrete road in ash bund (west side) to sump no. 02 (north side) in ash bund of stage-i at sstpp, mppgcl, dongalia distt. khandwa.
Read moreProvn of standby lt ug cable from 250 kva dg set to main distribution panel, 02 nos 160 kva dg set, 01 no 250 kva dg set along with allied works at ins kardip, kamorta under ge (i) campbell bay
Provn of standby lt ug cable from 250 kva dg set to main distribution panel, 02 nos 160 kva dg set, 01 no 250 kva dg set along with allied works at ins kardip, kamorta under ge (i) campbell bay
Read moreAAAAAAAAAA
Login to viewProtection work along left bank of river ganga for a length of 500.00 mtr at kesorpur to save the tagging point of new ring bundh within g.p.- uttar chandipur, p.s.-bhutni, block- manikchak, dist- malda. from ch. 59.100 km to ch. 59.60 km u/s of far
Read more420/construction of cc road in front of soda factory gate at ward no. 3 nagar parishad bargawan amlai
Construction of cc drain 1 gudiya baiga house to shani baiga house 2 chhotu baiga house to shakola road 3 shankar agariya house prakash house at ward no. 11 nagar parishad bargawan amlai
Read moreReplacement of existing rcc np3 pipeline with 600mm id di k7 rising main including works of providing laying jointing testing and commissioning from jallalabad road stp disposal works up to baba deep singh gurudwara sahib at sri muktsar sahib
Replacement of existing rcc np3 pipeline with 600mm id di k7 rising main including works of providing laying jointing testing and commissioning from jallalabad road stp disposal works up to baba deep singh gurudwara sahib at sri muktsar sahib
Read moreWbpwd/pw(r)/sepd/piu-i/nit-07 of 2025-2026,sl-1
New construction of di road from 0.000 km to 2.876 km to replace the existing bankura-durgapur road (sh-9) with in 37th km to 39th km stretching approx 2.5 km within the mine boundary of trans damodar coal mine vested to the durgapur projects
Read moreof your Industry type