Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Annual Maintenance Of Krishnakunj At Ob Dump At Krishnashila Project.
|
| Description |
Annual Maintenance Of Krishnakunj At Ob Dump At Krishnashila Project.
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_NCL_326530_1 |
|
Reference Number |
KSL/Civil/Tender/24-25/ETN-14 dtd 22.01.2025 |
| Tender Fee | 0 |
| EMD | 76300 |
| Tender Value | - |
| Place | Krishnashila Project |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=338454 |
| Start Date | January 23, 2025 14:30 |
| End Date |
Expired
07/02/2025
Expired 619 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Custom bid for services - extension of 3300v ht oh line towards active ob dump area for lighting purpose at kolgaon ocm
Custom bid for services - extension of 3300v ht oh line towards active ob dump area for lighting purpose at kolgaon ocm
Read moreRepairing and rewinding of 150 kw, 6.6 kv, 3ph induction motor (sl. no. 314021801) installed at conveyor 2.1 of krishnashila chp at krishnashila project.
Repairing and rewinding of 150 kw, 6.6 kv, 3ph induction motor (sl. no. 314021801) installed at conveyor 2.1 of krishnashila chp at krishnashila project.
Read moreConstruction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area
Construction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreEnergy dump system for capacitor safe discharge as per spec. no. arde/emrg10/pps/dump/01
Energy dump system for capacitor safe discharge as per spec. no. arde/emrg10/pps/dump/01
Read moreof your Industry type