Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Top & Bottom Brackets For Dampers 🛠️ The Ministry Of Railways, Under The Central Government, Invites Bids For The Supply Of A Set Of Top & Bottom Brackets For Dampers, With Complete Technical Specifications Detailed In The Tender Document. 📅 Bid Submission Deadline: May 24, 2024, 11:00 Am The Tender Fee Is Inr 0, With An Earnest Money Deposit (Emd) Of Inr 3060. Interested Bidders Should Review The Tender Document Thoroughly To Understand The Requirements And Submit Their Proposals Accordingly. Keywords: Ministry Of Railways, Top & Bottom Brackets, Dampers, Tender, Central Govt. Ministry/Department, Procurement, Engineering Supplies| Particulars | Details |
|---|---|
| Title |
Set Of Top & Bottom Brackets For Damper
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106325356 |
|
Reference Number |
30233244 |
| Tender Fee | 0 |
| EMD | 3060 |
| Tender Value | - |
| Place | Mumbai |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/052024/106325356/viewNitPdf_4547577.pdf |
| Start Date | April 23, 2024 20:42 |
| End Date |
Expired
24/05/2024
Expired 870 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of control damper assembly for mill hot primary air of unit-xi boiler
Supply of control damper assembly for mill hot primary air of unit-xi boiler
Read moreOn-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreOn-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreSupply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system
Supply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system
Read moreSupply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system
Supply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system
Read moreSupply of clinker grinder body, wear plates and drive sprockets for bottom ash handling system
Supply of clinker grinder body, wear plates and drive sprockets for bottom ash handling system
Read moreRoof top rain water harvesting work for type-3 houses in chitrakoot district
Roof top rain water harvesting work for type-3 houses in chitrakoot district
Read moreSupply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru
Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru
Read moreKtps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Ktps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Read moreCc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Cc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Read moreof your Industry type