Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
1 No. Transformer Oil Filtration & De Hydration Cum Hot Oil Circulation Plant For Dehar Ph Bbmb
|
| Description |
1 No. Transformer Oil Filtration & De Hydration Cum Hot Oil Circulation Plant For Dehar Ph Bbmb
|
| Organisation | BHAKRA BEAS MANAGEMENT BOARD | Bhakra Beas Managemet Board |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | September 29, 2026 22:45 |
| End Date |
Open
04/11/2026
23 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair /maint of transformer, de-hydration and filtration of transformer oil, calibration of ht eqpt and other allied works at fatehgarh cantt
Repair /maint of transformer, de-hydration and filtration of transformer oil, calibration of ht eqpt and other allied works at fatehgarh cantt
Read moreDindigul edc - works contract - labour charges for replacement of gasket for arresting heavy oil leakage and hot oil circulation in 16 mva,power transformer -ii at 110/22kv dindigul ss
Dindigul edc - works contract - labour charges for replacement of gasket for arresting heavy oil leakage and hot oil circulation in 16 mva,power transformer -ii at 110/22kv dindigul ss
Read moreDindigul edc - works contract - replacement of worn out gasket for arresting of oil leakage and hot oil circulation in 10mva,110/22 kv power transformer i at 110 / 22 kv kallimandayam ss
Dindigul edc - works contract - replacement of worn out gasket for arresting of oil leakage and hot oil circulation in 10mva,110/22 kv power transformer i at 110 / 22 kv kallimandayam ss
Read moreDindigul edc - works contract - replacement of worn out gasket for arresting of oil leakage and hot oil circulation in 16mva,110/22 kv power transformer i at 110/22 kv vedasandur ss
Dindigul edc - works contract - replacement of worn out gasket for arresting of oil leakage and hot oil circulation in 16mva,110/22 kv power transformer i at 110/22 kv vedasandur ss
Read moreNctps i es circle em i division s dn iii esp hot oil circulation and replacement of all gaskets for 24 nos 75 kva 373 5 v 70 kv dc peak high voltage rectifier transformer in unit i during annual overhauling 2026 27
Nctps i es circle em i division s dn iii esp hot oil circulation and replacement of all gaskets for 24 nos 75 kva 373 5 v 70 kv dc peak high voltage rectifier transformer in unit i during annual overhauling 2026 27
Read moreDouble laminar air flow units,ph meter cum conductivity meter,horizontal autoclave,magnetic stirrer,ec meter,magnetic stirrer with hot plate,glass bead sterilizer,stereo zoom microscope with camera,rotary shaker,electronic balance precision
Double laminar air flow units,ph meter cum conductivity meter,horizontal autoclave,magnetic stirrer,ec meter,magnetic stirrer with hot plate,glass bead sterilizer,stereo zoom microscope with camera,rotary shaker,electronic balance precision
Read moreDe hydration and filtration of transformer oil for 1000 kva,de hydration and filtration of transfor
Read more
Maintenance, repair, and overhaul of the de-hydration cum heating chamber at the transformer repair shop in cws (x) talcher mcl
Maintenance, repair, and overhaul of the de-hydration cum heating chamber at the transformer repair shop in cws (x) talcher mcl
Read morePh-ii - hot oil circulation (main and conservator tank) in 41mva, bharat bijlee ltd make, steam turbine generation power transformer and 12.5mva indo tech make unit auxiliary transformer
Ph-ii - hot oil circulation (main and conservator tank) in 41mva, bharat bijlee ltd make, steam turbine generation power transformer and 12.5mva indo tech make unit auxiliary transformer
Read moreFiltration, hot oil circulation and dissolved gas analysis of 21 nos. oil type transformers installed at port
Filtration, hot oil circulation and dissolved gas analysis of 21 nos. oil type transformers installed at port
Read moreof your Industry type