The Work Of Erection And Commissioning Of Main Rail Table Of Wagon Tippler No. 3 Including Dismantling And Removal Of Old One And Transportation, Shifting, Installation And Commissioning Of New One Of Chp, Btps, Obra.
Description
The Work Of Erection And Commissioning Of Main Rail Table Of Wagon Tippler No. 3 Including Dismantling And Removal Of Old One And Transportation, Shifting, Installation And Commissioning Of New One Of Chp, Btps, Obra.
Organisation UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT
Tender Id 2024_RVUNL_984620_1
Reference
Number
N-OBR////6000006788_00
Tender Fee 1180
EMD 46500
Tender Value
Place Obra Thermal Power Station
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1734892
Start Date December 19, 2024 14:30
End Date

03/01/2025 ( Expired 107 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of interlocking tiles boundary wall maintenance new main gate and many more work (toiler work, ties, putty distemper etc) work at govt. m.s. ganga malanpur zone no. 23 ward no. 63 file no. 250/24x3/3

Construction of interlocking tiles boundary wall maintenance new main gate and many more work (toiler work, ties, putty distemper etc) work at govt. m.s. ganga malanpur zone no. 23 ward no. 63 file no. 250/24x3/3

Read more
Construction work of c.c. road m-30, m-20 and curbed drain at various places in uday nagar basti no.1 basti 2 basti 3 and new shobhapur and old gokalpur area under gokalpur ward. (any mad)

Construction work of c.c. road m-30, m-20 and curbed drain at various places in uday nagar basti no.1 basti 2 basti 3 and new shobhapur and old gokalpur area under gokalpur ward. (any mad)

Read more
The work of jointing/repairing and machining of different size of shafts of wagon tippler of chp, btps, obra.

The work of jointing/repairing and machining of different size of shafts of wagon tippler of chp, btps, obra.

Read more
Thorough overhauling and painting of wagon tippler 3 with necessary allied works at chp, btps

Thorough overhauling and painting of wagon tippler 3 with necessary allied works at chp, btps&amp#x0d

Read more
Supply, dismantling erection testing and commissioning of existing hydraulic rail clamp assembly for thyssenkrupp make stacker cum reclaimer of conveyor 8a installed at 4x210 mw chp i at sgtps, mppgcl, birsinghpur

Supply, dismantling erection testing and commissioning of existing hydraulic rail clamp assembly for thyssenkrupp make stacker cum reclaimer of conveyor 8a installed at 4x210 mw chp i at sgtps, mppgcl, birsinghpur

Read more
Design, supply, erection, installation, testing and commissioning of 01 (one) no. of air-cooled heat exchanger (ache) for dresser rand make gas compressor unit 8 at phase-ii of lakwa thermal power station (ltps), apgcl, maibella.

Design, supply, erection, installation, testing and commissioning of 01 (one) no. of air-cooled heat exchanger (ache) for dresser rand make gas compressor unit 8 at phase-ii of lakwa thermal power station (ltps), apgcl, maibella.

Read more
Annual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.

Annual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.

Read more
Supply, erection, testing and commissioning of 2 no. elevators including 1 year of dlp in new office building of ada, amritsar at sgrd urban estate(old jail site) amritsar

Supply, erection, testing and commissioning of 2 no. elevators including 1 year of dlp in new office building of ada, amritsar at sgrd urban estate(old jail site) amritsar

Read more
Formation of road embankment with gravel from silos to wagon tippler road chp v.stage

Ktps-v vi stages -civil- o m-ii- formation of road embankment with gravel from vth stage silos along the ash pipe lines upto y junction of wagon tippler road in chp area, providing 6mm thick acc sheets in place of damaged sheets for cladding of old crusher house in chp area and providing structural steel staircase to the spf building at main gate for monitoring the aaqms of ktps-v vi.stages.

Read more
Dismantling, supply, erection ,testing and commissioning for the replacement and renovation of old 33 kv line by mono pole at industrial area no.1, 2 and 3 at a.b. road, dewas with amc of 5 years under onm circle dewas of mppkvvcl indore under sstd

Dismantling, supply, erection ,testing and commissioning for the replacement and renovation of old 33 kv line by mono pole at industrial area no.1, 2 and 3 at a.b. road, dewas with amc of 5 years under onm circle dewas of mppkvvcl indore under sstd

Read more