Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Const Of Paver Surface Over Kutcha Road From Nilakantha Mojumdar House To Sanjit Mandal House In Ward No 12
|
| Description |
Civil Work
|
| Organisation | Government of Odisha |
| Tender Id | 2023_ORULB_93058_1 |
|
Reference Number |
EOUM-7/2023-24(67) |
| Tender Fee | 2000 |
| EMD | 2317 |
| Tender Value | - |
| Place | UMERKOTE MUNICIPALITY |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in |
| Start Date | August 23, 2023 23:30 |
| End Date |
Expired
02/09/2023
Expired 1137 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of over head water tank and water distribution system in mandal kara madhepura.
Construction of over head water tank and water distribution system in mandal kara madhepura.
Read moreRepair to hl bridge over river kuanria on saradhapur dholamara road such as gr-iii metalling, pmc and sc over damaged bt surface for the year 2026-27
Repair to hl bridge over river kuanria on saradhapur dholamara road such as gr-iii metalling, pmc and sc over damaged bt surface for the year 2026-27
Read moreSpecial repair (sr) work over the damage surface in stretches between km 317.00 to km 320.00 of nh-14 (nh-60)
Special repair (sr) work over the damage surface in stretches between km 317.00 to km 320.00 of nh-14.
Read moreSupplying, laying, fixing and fitting 80mm thick m40 grade precast paver blocks and rcc drain with slab , mango ward no.13 teachers colony from u.p mandal house to paras ram house and different cross road.
Supplying, laying, fixing and fitting 80mm thick m40 grade precast paver blocks and rcc drain with slab , mango ward no.13 teachers colony from u.p mandal house to paras ram house and different cross road.
Read moreMacadamization of higni chakka road by way of providing and laying 75 mm thick wmm, 50 mm bm for surface corrections at different locations and 25 mm ogpc over full width under city and towns
Refer to boq
Read moreMacadamization of panchal tulihal road by way of providing and laying 75 mm thick wmm, 50 mm bm for surface corrections at different locations and 25 mm ogpc over full width under city and towns
Refer to boq
Read moreCarriage of material by mechanical transport from rajnagar opencast mine to 7a1 seam and filling/spreading and leveling on surface cracks ,potholes and subside area of 7a1 seam by over burden material at jhiria ug mine.
Carriage of material by mechanical transport from rajnagar opencast mine to 7a1 seam and filling/spreading and leveling on surface cracks ,potholes and subside area of 7a1 seam by over burden material at jhiria ug mine.
Read moreRemoval of existing 1.5 ft height wall,construction of 3.5 ft height wall including 2 ft underground,construction of new floor for skating rink,extension of iron railing over boundary wall,painting and marking of rink surface
Removal of existing 1.5 ft height wall,construction of 3.5 ft height wall including 2 ft underground,construction of new floor for skating rink,extension of iron railing over boundary wall,painting and marking of rink surface
Read moreTtps mechii tm i unitiii removal of deteriorated cladding over the inner surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of
Ttps mechii tm i unitiii removal of deteriorated cladding over the inner surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of
Read moreRepair to bridge over dahuka nallah at 0.500km on rd road to raghunathpur road such as scarifying bt surface with provision of gr-iii metalling at patches with pmc and sc at both side approaches for the year 2026-27
Repair to bridge over dahuka nallah at 0.500km on rd road to raghunathpur road such as scarifying bt surface with provision of gr-iii metalling at patches with pmc and sc at both side approaches for the year 2026-27
Read moreof your Industry type