Tender Details

Particulars Details
Title
22/Nit/Ee/Kcd/2025 26
Description
C/O Office Building And Staff Quarters Including Rcc Retaining Wall, Rcc Sump, Septic Tank And Drainage For Sib At Changtongya, Nagaland. Sh: Construction Of Rcc Compound Wall And Raising Height Of Existing Rcc Retaining Wall For Sib Civint Changtongya (Nagaland).
Organisation Central Public Works Department (CPWD) | Central Govt. Ministry/Department
Tender Id 126085
Reference
Number
2400013042-HB-06000
Tender Fee 0
EMD 94531
Tender Value -
Place
Link
View Original Tender Notice

https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=637077642463707764243132363038352432322f4e49542f45452f4b43442f323032352d3236

Start Date September 09, 2025 19:59
End Date
Expired 16/09/2025

Expired 400 days ago

Search Similar tenders?

Bidding on tenders like this?

Partners, bid preparation, supplier quotes and GeM registration, from our team and partners.

Similar Tenders
Raising height of barvi dam rehabilitation work construction of retaining wall at kolewadkhal ii gaothan.

Raising height of barvi dam rehabilitation work construction of retaining wall at kolewadkhal ii gaothan.

Read more
Raising the height of ms grill in the lift lobby passage area at all floors in nalanda officers quarters, chembur, mumbai

Raising the height of ms grill in the lift lobby passage area at all floors in nalanda officers quarters, chembur, mumbai

Read more
At guwahati- construction of septic tanks along with renovation of toilet for 104 units staff quarters under the jurisdiction of sse/works/ghy.

At guwahati- construction of septic tanks along with renovation of toilet for 104 units staff quarters under the jurisdiction of sse/works/ghy.

Read more
2x600 mw, stage-i - proposal for raising the height of existing rcc pedestal/footing around steel columns in unit-1 and unit-2 boiler area of sstpp, mppgcl, dongalia.

2x600 mw, stage-i - proposal for raising the height of existing rcc pedestal/footing around steel columns in unit-1 and unit-2 boiler area of sstpp, mppgcl, dongalia.

Read more
Construction of rcc retaining wall along with boundary wall adjacent to type iii quarters of kunjaban extension, agartala under capital complex subdivision no i during the year 2026 27

Construction of rcc retaining wall along with boundary wall adjacent to type iii quarters of kunjaban extension, agartala under capital complex subdivision no i during the year 2026 27

Read more
Excavation,rubble soling,pcc m15,rcc m25,shuttering,brick masonary 230 mm thick,plaster 15mm thick,reinforcement,back filling for raising height,ultratech rapid hard rmc concrete m30 including trimix and grove cutting,150 micron ldp sheet,providing and laying 300mm rcc hume pipe

Excavation,rubble soling,pcc m15,rcc m25,shuttering,brick masonary 230 mm thick,plaster 15mm thick,reinforcement,back filling for raising height,ultratech rapid hard rmc concrete m30 including trimix and grove cutting,150 micron ldp sheet,providing and laying 300mm rcc hume pipe

Read more
Electrical work in connection with provision of improvement/major repairs of staff quarters in railway colony at gonda station, replacement of damaged/leaky roofs of colony staff quarters and replacement of damaged court yard doors and back doors of staff quarters 500 unit type-i, type-ii and type-iii in all colony at gonda station, provision of cover shed for 06 wagon capacity & 02 nos. labour shed at blp and major improvement work like raising and extension of pf no. 1 & 2, provi

Electrical work in connection with provision of improvement/major repairs of staff quarters in railway colony at gonda station, replacement of damaged/leaky roofs of colony staff quarters and replacement of damaged court yard doors and back doors of staff quarters 500 unit type-i, type-ii and type-iii in all colony at gonda station, provision of cover shed for 06 wagon capacity & 02 nos. labour shed at blp and major improvement work like raising and extension of pf no. 1 & 2, provi

Read more
1) reconstruction of ty-ii staff quarters at arsikere (ask) (12 units) in lieu of quarters no. 12/a-d, 17/a-d & 29/a-d. 2) spgr-ask section: proposed construction of differential height rub with cover shed at km 138/200-300 in lieu of lc no. 82 between rdi-ttr stations.

1) reconstruction of ty-ii staff quarters at arsikere (ask) (12 units) in lieu of quarters no. 12/a-d, 17/a-d & 29/a-d. 2) spgr-ask section: proposed construction of differential height rub with cover shed at km 138/200-300 in lieu of lc no. 82 between rdi-ttr stations.

Read more
Construction of staff quarters at (gajrahi, bahari, deosar and gondawali station and overhead & under ground water tank with water supply & distribution pipe line, including plumbing, bore well, hand pump, drainage, sewerage & sanitary work with septic tank, boundary wall, road work and other miscellaneous work in between sidhi-gondawali section and miscellaneous protection works for major/minor bridges, high embankment slope protection, rcc toe wall/gabion wall at locations whe

Construction of staff quarters at (gajrahi, bahari, deosar and gondawali station and overhead & under ground water tank with water supply & distribution pipe line, including plumbing, bore well, hand pump, drainage, sewerage & sanitary work with septic tank, boundary wall, road work and other miscellaneous work in between sidhi-gondawali section and miscellaneous protection works for major/minor bridges, high embankment slope protection, rcc toe wall/gabion wall at locations whe

Read more

This tender has closed

Leave your details and we'll alert you to new tenders like it.

Free tender checklists for your industry →