Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Clearing Of Heavy Jungle And Fixing Of Demarcation Stones For 350 Acres At Pallam Village
|
| Description |
Clearing Of Heavy Jungle And Fixing Of Demarcation Stones For The Proposed Layout Plots For Additional Land Of 350 Acres At Pallam Village Of Yerpedu Mandal, Tirupati District.
|
| Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
| Tender Id | 710260 |
|
Reference Number |
152/SE-III/TTD/2023-24 |
| Tender Fee | 2907 |
| EMD | 82500 |
| Tender Value | |
| Place | AP |
| Link |
View Original Tender Notice
https://tender.apeprocurement.gov.in |
| Start Date | January 13, 2024 18:30 |
| End Date |
Expired
20/01/2024
Expired 878 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
-premonsoon work-general premonsoon work nh66 clearing drain,cutting branches of tree and providing coverslab to existing drain from engandiyoor 375/300 to thalikulam 381/550,chavakkad 363/180 to orumanayoor ch 365/680,pappili ch 351/650 to mandalam
This&#x0d estimate includes the clearing jungle, drain&#x0d cleaning, tree cutting,earthendrain,replacing&#x0d damaged cover slabs for drain etc.
Read morePremonsoon work- nh66 clearing drain,cutting branches of tree, and providing cover slabs to existing drain from nattika km 383/000 to anjamparuthy km 403/000
Provisions for clearing jungle, drain&#x0d cleaning,earthendrain, tree cutting,replacing&#x0d damaged cover slabs etc are included in this&#x0d estimate.
Read moreConstruction of balance bop elementats at 142 nos non-composite bops where land is more than 03 acres 02nd phase sh - consultancy services for complete soil investigation for 4 nos bops namely bop thakupur and adhiyan of 58 bn now 135 bn bop kass
Construction of balance bop elementats at 142 nos non-composite bops where land is more than 03 acres 02nd phase sh - consultancy services for complete soil investigation for 4 nos bops namely bop thakupur and adhiyan of 58 bn now 135 bn bop kass
Read moreHeavy duty round endless polyster sling of effective length 3 meters (circumfertial length of 6 meters) of 04ton capacity with testing certifiate.
For complete deion and other details, please refer to tender
Read moreSupply and fixing of online ups with battery at koothanallur municipality
Supply and fixing of online ups with battery at koothanallur municipality
Read moreProviding suitable manpower for up keeping and maintenance of transit flats and mess facility at bhel btps site employees residence at heavy water plant m township aswapuram
Providing suitable manpower for up keeping and maintenance of transit flats and mess facility at bhel btps site employees residence at heavy water plant m township aswapuram
Read moreProviding and fixing of street light poles and led for new infrastructure work and upgradation work at i.a. malanpur, district bhind.
Providing and fixing of street light poles and led for new infrastructure work and upgradation work at i.a. malanpur, district bhind.
Read moreProviding and fixing of iron gate of type-v qtr at stc bsf chakur
Providing and fixing of iron gate of type-v qtr at stc bsf chakur.
Read more1.repairing of otta 2.providing and fixing fencing for cemetry 3.construction drainage pipe line (underground)4.constructing drainage pipe line (underground5.construction of c.c. drain6.providing and fixing paver block at. g.p. gharod ta. khamgaon
1.repairing of otta 2.providing and fixing fencing for cemetry 3.construction drainage pipe line (underground)4.constructing drainage pipe line (underground5.construction of c.c. drain6.providing and fixing paver block at. g.p. gharod ta. khamgaon
Read moreSupply and fixing of double interposing gland bush for different control panels at 3.3kv main substation of karma ocp under kuju area.
Supply and fixing of double interposing gland bush for different control panels at 3.3kv main substation of karma ocp under kuju area.
Read moreof your Industry type