Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Alert: End Top Coping For Boxnr 🛠️ The Ministry Of Railways, Specifically The Central Government Ministry/Department, Is Seeking Bids For The Supply Of End Top Coping For Boxnr. 🏗️ 📅 Bid Submission Deadline: June 17, 2024, 1:30 Pm Interested Bidders Are Requested To Review The Complete Tender Document For Detailed Specifications And Submission Guidelines. Keywords: End Top Coping, Boxnr, Ministry Of Railways, Government Tender, Infrastructure, Railways| Particulars | Details |
|---|---|
| Title |
End Top Coping For Boxnr
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106360018 |
|
Reference Number |
55245606 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Kolkata |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/062024/106360018/viewNitPdf_4587356.pdf |
| Start Date | May 29, 2024 17:52 |
| End Date |
Expired
17/06/2024
Expired 846 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Requirement of high end monochrome multi function printers under buyback
Requirement of high end monochrome multi function printers under buyback
Read moreRoof top rain water harvesting work for type-3 houses in chitrakoot district
Roof top rain water harvesting work for type-3 houses in chitrakoot district
Read moreEngaging of tractor mounted front end dozer blade for sanitation activities in bellampally municipality
Engaging of tractor mounted front end dozer blade for sanitation activities in bellampally municipality
Read moreRepairing damaged pipe line from iwss pipeline near traffic point to diesel filling station and chp end at lingaraj ocp, lingaraj area.(retender)
Repairing damaged pipe line from iwss pipeline near traffic point to diesel filling station and chp end at lingaraj ocp, lingaraj area.(retender)
Read moreConstruction of open drain from vaayu vihar to dead end in ward no.8 in gummadidala municipality under mgf 2026-27.(reserved for sc community)
Construction of open drain from vaayu vihar to dead end in ward no.8 in gummadidala municipality under mgf 2026-27.(reserved for sc community)
Read moreBagaha ward no. 11, drain construction work passing through various wards via hanuman garhi till the last end of ward no. 34 i.e. malpurwa harha river.
Bagaha ward no. 11, drain construction work passing through various wards via hanuman garhi till the last end of ward no. 34 i.e. malpurwa harha river.
Read moreProcurement and supply of ot lights high end and surgical diathermy with vessel sealing to vascular access centres in telangana state under rate contract for a period of 2 years
Procurement and supply of ot lights high end and surgical diathermy with vessel sealing to vascular access centres in telangana state under rate contract for a period of 2 years
Read moreOn-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreOn-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreof your Industry type