Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Routine, Periodical, Prlve, Break Down And Comprehensive Operation And Maintenance Of Power Pump Providing In The Bore Well And Open Well 103 Nos Inclusive Of Attending The Leakages In Distribution Pipeline For One Year In 28,29,36,37 And 38
|
| Description |
Routine, Periodical, Prlve, Break Down And Comprehensive Operation And Maintenance Of Power Pump Providing In The Bore Well And Open Well (103 Nos) Inclusive Of Attending The Leakages In Distribution Pipeline For One Year In 28,29,36,37 And 38
|
| Organisation | MAWS | State Govt. and UT |
| Tender Id | 2024_MAWS_410170_2 |
|
Reference Number |
590/2023-24/S/Z-4/EE.TCMC |
| Tender Fee | 0 |
| EMD | 58500 |
| Tender Value | - |
| Place | Tiruppur |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=488069 |
| Start Date | January 15, 2024 14:30 |
| End Date |
Expired
19/01/2024
Expired 999 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Operation and maintenance of led street lights including routine break down maintenance and preventive maintenance works for two years in 60 wards of thoothukudi city municipal corporation
Operation and maintenance of led street lights including routine break down maintenance and preventive maintenance works for two years in 60 wards of thoothukudi city municipal corporation
Read moreAnnual work contract for online leakages attending without any shut down of the units by online sealing technique in turbine and boiler area of unit5and6 of 2x660 mw, csctpp, rvunl, chhabra
Annual work contract for online leakages attending without any shut down of the units by online sealing technique in turbine and boiler area of unit5and6 of 2x660 mw, csctpp, rvunl, chhabra
Read moreWork of routine and breakdown maintenance of turbine, heat exchangers and their components and operation and routine break-down maintenance of 2 nos. of eot cranes (125/25 mt) in tg hall, of sstps unit - 1 to 6 (6x250mw),suratgarh
Work of routine and breakdown maintenance of turbine, heat exchangers and their components and operation and routine/break-down maintenance of 2 nos. of eot cranes (125/25 mt) in tg hall, of sstps unit - 1 to 6 (6x250mw),suratgarh.
Read moreAnnual operation and maintenance contract for round the clock routine services, preventive maintenances and break down services for 66/11kv grid substation, 11/0.433kv substations including all transformers, pss, dg sets, ht and lt panels and cables
Annual operation and maintenance contract for round the clock routine services, preventive maintenances and break down services for 66/11kv grid substation, 11/0.433kv substations including all transformers, pss, dg sets, ht and lt panels and cables
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - wt5248g work of online, routine preventive break down aoh and coh maintenance of ash handling plant silo system including manual pocking of ash hoppers in unit no 3 4 an..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - wt5248g work of online, routine preventive break down aoh and coh maintenance of ash handling plant silo system including manual pocking of ash hoppers in unit no 3 4 an..
Read moreAttending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Attending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Read moreAttending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Attending to break down calls,replacement lightening arrestor,replacement of faulty 11kv outdoor cable end termination,supplying laying acsr weasel conductor,replacement of 63a tpn switch fuse unit,replacement of 63a rewireable prcelin fuse set,replacement of 100a rewireable prcelin fuse set,replacement of pin insulators,replacement of disc insulators,dismantling the faulty transformer,refurbishment transformer 16 or 25 kva al wound,refurbishment transformer 63 kva capacity al wound,transportation charges for transformer,supplying laying of 3 into 50 sqmm ht ab cable,supplying laying of 4 into 25 sqmm lt ab cable,supplying making end termination for 4 core 25 sqmm lt ab cable
Read moreInspection testing checking,attending break down faults,attending break down faults,attending break
Read more
of your Industry type