Tender Details
Particulars | Details |
---|---|
Title |
Dismantling, Transportation And Installation Of Vishwa 1200 Mm, 2 X110 Kw Belt Conveyor From Junction Of D 18 B/G Xvi (T) Seam And 10 Rise To Junction Of 4 Dip And E8 B/G Xvi (B)via D18 B/G, 7 Dip And Dr3 Drift In Underground At Moonidih Colliery
|
Description |
Dismantling, Transportation And Installation Of Vishwa 1200 Mm, 2 X110 Kw Belt Conveyor From Junction Of D 18 B/G Xvi (T) Seam And 10 Rise To Junction Of 4 Dip And E8 B/G Xvi (B)via D18 B/G, 7 Dip And Dr3 Drift In Underground At Moonidih Colliery
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_327185_1 |
Reference Number |
BCCL/WJA/MND/SUR/2024-25/67 |
Tender Fee | 0 |
EMD | 10547 |
Tender Value | |
Place | Moonidih Colliery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=339127 |
Start Date | January 29, 2025 16:30 |
End Date |
08/02/2025 ( Expired 119 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Transportation of different items and daily maintenance of of belt conveyor (45days)of xvi(b)seam at moonidih colliery, w.j. area
Transportation of different items and daily maintenance of of belt conveyor (45days)of xvi(b)seam at moonidih colliery, w.j. area
Read moreCleaning of muck and debris 4th dip 1200mm belt and roof blasting, mucking and roof support in 4th dip drive head area of 4th dip 1200mm belt and miscellaneous work in 4th dip xvi b at 500 mh at moonidih colliery, w.j.area
Cleaning of muck and debris 4th dip 1200mm belt and roof blasting, mucking and roof support in 4th dip drive head area of 4th dip 1200mm belt and miscellaneous work in 4th dip xvi b at 500 mh at moonidih colliery, w.j.area
Read moreConstruction of epi stopping in 7th rise between tg of e-8 and bg of e-9 panel in xvi(b) seam 500mh at moonidih colliery w.j area .
Construction of epi stopping in 7th rise between tg of e-8 and bg of e-9 panel in xvi(b) seam 500mh at moonidih colliery w.j area .
Read moreCleaning of spillage muck/debris along tc06 belt conveyor by digging with pick/shovel and loading on belt conveyor by carrying manually upto distance of 50m, xvi(t) seam at moonidih colliery, w.j. area
Cleaning of spillage muck/debris along tc06 belt conveyor by digging with pick/shovel and loading on belt conveyor by carrying manually upto distance of 50m, xvi(t) seam at moonidih colliery, w.j. area
Read moreDismantling, transporting of endless haulage from d-18 top gate from xvi top seam to e9 top gate of xvi bottom seam, loading and transportation of endless rope and controller ,geb to 8th dip xvseam of moonidih colliery, w j area
Dismantling, transporting of endless haulage from d-18 top gate from xvi top seam to e9 top gate of xvi bottom seam, loading and transportation of endless rope and controller ,geb to 8th dip xvseam of moonidih colliery, w j area
Read moreConstruction of two nos epi stopping (left out work) in t/g and b/g of d-18 panel in xvi(t) seam 500mh at moonidih colliery w.j area
Construction of two nos epi stopping (left out work) in t/g and b/g of d-18 panel in xvi(t) seam 500mh at moonidih colliery w.j area
Read moreHeightening and roof bolting in d-18 bg between 7th dip to drift(xvi top) and in 6th dip , e-8 tg inside the 6th dip of xvi(b) seam at moonidih colliery, w j area
Heightening and roof bolting in d-18 bg between 7th dip to drift(xvi top) and in 6th dip , e-8 tg inside the 6th dip of xvi(b) seam at moonidih colliery, w j area
Read moreConstruction of one stoppings (1mt thick) in 6th rise between tg of e-7 panel and bg of e-8 panel in xvi(b) seam 500mh at moonidih colliery w.j area
Construction of one stoppings (1mt thick) in 6th rise between tg of e-7 panel and bg of e-8 panel in 
 xvi(b) seam 500mh at moonidih colliery w.j area
Read moreRemoval of spillage muck/debris from 9th dip to level inside up to face of d-18 bg and in old d-18 bg inside the 6th dip for smooth running of belt and 60 ibs track line installation in xvi (t) seam, moonidih colliery, wj area
Removal of spillage 
 muck/debris from 9th dip 
 to level inside up to face of 
 d-18 bg and in old d-18 
 bg inside the 6th dip for 
 smooth running of belt and 
 60 ibs track line 
 installation in xvi (t) 
 seam, moonidih colliery, 
 wj area
Read moreLoading, transportation and unloading of new dismantling and shortening of 800mm belt with drive head and structure complete with electricals from e9lhd depillaring panel to e8/main dip panel of bagdona seam at tawa mine of pathakhera area.
Loading, transportation and unloading of new dismantling and shortening of 800mm belt with drive head and structure complete with electricals from e9lhd depillaring panel to e8/main dip panel of bagdona seam at tawa mine of pathakhera area.
Read moreof your Industry type