Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Bmc Biennial Maintenance Contract For Plc Of Stacker Reclaimer1 And 2 In
|
| Description |
|
| Organisation | Contracts and Materials | Ministry of Power |
| Tender Id | GEM/2024/B/5184864 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | August 13, 2024 22:29 |
| End Date |
Expired
27/08/2024
Expired 774 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|
| 1 | SCHNEIDER ELECTRIC INDIA PRIVATE LIMITED | 27-08-2024 08:15:20 | N/A | Qualified |
Tggenco-ktps vii stage/paloncha - supply of split ac spares for various plc room locations
Tggenco-ktps vii stage/paloncha - supply of split ac spares for various plc room locations
Read moreProcurement of hydraulic system spares required for stacker cum reclaimers working in chp at stpp, jaipur, mancherial, telangana.
Procurement of hydraulic system spares required for stacker cum reclaimers working in chp at stpp, jaipur, mancherial, telangana.
Read moreKtps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.
Ktps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.
Read moreSolid state drives (ssd) for workstations of max dna and bop plc hmi systems of ktps-vi stage
Solid state drives (ssd) for workstations of max dna and bop plc hmi systems of ktps-vi stage
Read moreReplacement of damaged slew bearing with new one at trf make stacker cum reclaimer machine in coal handling plant of ktps-v and vi stages.
Replacement of damaged slew bearing with new one at trf make stacker cum reclaimer machine in coal handling plant of ktps-v and vi stages.
Read moreAnnual maintenance service contract for skf-lincoln make centralized dual line lubrication systems at the new stacker reclaimer machine in chp, ktps v and vi stages for the year 2026-27.
Annual maintenance service contract for skf-lincoln make centralized dual line lubrication systems at the new stacker reclaimer machine in chp, ktps v and vi stages for the year 2026-27.
Read moreOn-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreOn-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreElectrical renovation of stacker cum reclaimer1 along with new plc installation under chp em, ktps through capex 2024-25
Electrical renovation of stacker cum reclaimer1 along with new plc installation under chp em, ktps through capex 2024-25
Read moreof your Industry type