Tender Details
Particulars | Details |
---|---|
Title |
Renovation Work Along With General Repair By Plant On The Jari Kheda Link Road From Nh 2 Via Malajani Nagla Hulasi
|
Description |
Renovation Work Along With General Repair By Plant On The Jari Kheda Link Road From Nh 2 Via Malajani Nagla Hulasi
|
Organisation | Cheif Engineer Kanpur Zone PWD Kanpur | State Govt. and UT |
Tender Id | 2025_CEKNP_1019546_9 |
Reference Number |
679/11a/2024-25 dT. 17-03-2025 |
Tender Fee | 944 |
EMD | 2.16 Lakh |
Tender Value | |
Place | Jaswantnagar |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1838906 |
Start Date | March 20, 2025 14:30 |
End Date |
25/03/2025 ( Expired 28 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Read moreRenewal work by sdbc in vijaynager-pathalidhar motor road from km 2 to 8 in augastyamuni block in district rudraprayag under annual repair.
Renewal work by sdbc in vijaynager-pathalidhar motor road from km 2 to 8 in augastyamuni block in district rudraprayag under annual repair.
Read moreRenewal with general repair of nh - 2/25 to sherpur taraunda road (vr) in km. 3(650) and 4(500)
Renewal with general repair of nh - 2/25 to sherpur taraunda road (vr) in km. 3(650) and 4(500)
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreRenovation work in maldhanchaud devipura durgavali-kilawali road via maldhan hathidungar from km 6 of ramnagar karanpur motor road in distt nainital by sdbc.
Renovation work in maldhanchaud devipura durgavali-kilawali road via maldhan hathidungar from km 6 of ramnagar karanpur motor road in distt nainital by sdbc.
Read moreWork of lowering ,complete isolation and sealing from reservoir and tail race by stop log and dt gate along with associated underwater works for 2 units at ghps,mppgcl
Work of lowering ,complete isolation and sealing from reservoir and tail race by stop log and dt gate along with associated underwater works for 2 units at ghps,mppgcl
Read moreReinvitation of bid for construction of canal crossing structure below the constructed highway along with service road at km. 357.075 of rewa katni jabalpur pke 2 section of nh 30 old nh7 in the state madhya pradesh on item rate percentage basis
Reinvitation of bid for construction of canal crossing structure below the constructed highway along with service road at km. 357.075 of rewa katni jabalpur pke 2 section of nh 30 old nh7 in the state madhya pradesh on item rate percentage basis
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreConstruction of link road from ntphc to yogos yokma via shilang khor mohallah lingshet ( by way of causeway,4mtr span rcc culvert and bt work). (under sdp)
Construction of link road from ntphc to yogos yokma via shilang khor mohallah lingshet ( by way of causeway,4mtr span rcc culvert and bt work). (under sdp)
Read moreConstruction of balance new service road mnb culverts drain vup-lvup-svup and its work km 656.000-km725.185 of rewa katni jabalpur section (p-1) and from km 725.185-km774.068 and km793.065-km813.257 (p-2) of nh-30 in the state of mp on epc mode
Construction of balance new service road mnb culverts drain vup-lvup-svup and its work km 656.000-km725.185 of rewa katni jabalpur section (p-1) and from km 725.185-km774.068 and km793.065-km813.257 (p-2) of nh-30 in the state of mp on epc mode
Read moreof your Industry type