Tender Details
Particulars | Details |
---|---|
Title |
Road Improvement Work From Sumit Bajpai House To Shashi Kant Mishra House In Ward 17 Under Zone 06
|
Description |
Road Improvement Work From Sumit Bajpai House To Shashi Kant Mishra House In Ward 17 Under Zone 06
|
Organisation | Kanpur Municipal Corporation, Kanpur, UP | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2714 |
EMD | 3 Lakh |
Tender Value | |
Place | KANPUR |
Link |
AAAAAAAAAA Login to view |
Start Date | May 23, 2025 20:30 |
End Date |
31/05/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreThe work of raising the street and constructing the drainage and interlocking and interlocking repair from khalid house in bhadasa nayapura through rizwaah, munmun, and sukhnan shah mosque to nazir neta house.
The work of raising the street and constructing the drainage and interlocking and interlocking repair from khalid house in bhadasa nayapura through rizwaah, munmun, and sukhnan shah mosque to nazir neta house.
Read moreWidening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Read moreConstruction work of interlocking tiles and drain from manohar lal s house to community toilet in village tiyar jagir. (mlay-nawabganj)
Construction work of interlocking tiles and drain from manohar lal s house to community toilet in village tiyar jagir. (mlay-nawabganj)
Read morePerformance based maintenance contract (pbmc) work on nh 02 (old nh 61) from km 125.000 to km 135.000 (length 10.00 km) under nh division ii mokokchung in the state of nagaland
Performance based maintenance contract (pbmc) work on nh 02 (old nh 61) from km 125.000 to km 135.000 (length 10.00 km) under nh division ii mokokchung in the state of nagaland
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConstruction of drain from boundary of pwd rest house to chichli tiraha in rajendra babu ward, nagar palika parishad gadarwara
Construction of drain from boundary of pwd rest house to chichli tiraha in rajendra babu ward, nagar palika parishad gadarwara
Read moreReconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.
Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.
Read moreOne time improvement of shillong-jowai road including construction of pucca side drain with footpath from km 54.200 to 69.200 km length 15.00 km in the state of meghalaya . job no. 44-mg-2024-25-178
One time improvement of shillong-jowai road including construction of pucca side drain with footpath from km 54.200 to 69.200 km length 15.00 km in the state of meghalaya . job no. 44-mg-2024-25-178
Read moreWbpwd(r)/se/ chc/nit-01/ 25-26/1 / kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Read moreof your Industry type