Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Sabha Mandap In Survey No.5/2 Near The House Of Shree Suryakant Gaonkar At Velguem, V.P. Cotorem In Valpoi Constituency (Under Mla Lad Scheme).
|
Description |
Construction Of Sabha Mandap In Survey No.5/2 Near The House Of Shree Suryakant Gaonkar At Velguem, V.P. Cotorem In Valpoi Constituency (Under Mla Lad Scheme).
|
Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
Tender Id | 2025_PWD_19587_1 |
Reference Number |
PWD/DIVISION XVI (BC)/TS/26/2024-2025 Line 03 |
Tender Fee | 12000 |
EMD | 82961 |
Tender Value | |
Place | Velguem, V.P. Cotorem in Valpoi Constituency |
Link | https://eprocure.goa.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=20017 |
Start Date | January 25, 2025 17:30 |
End Date |
31/01/2025 ( Expired 133 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of r.c.c.drain in ward no 2 manish verma house to ramjan bhaijan house at chourai
Construction of r.c.c.drain in ward no 2 manish verma house to ramjan bhaijan house at chourai
Read moreConstruction of 150m, 2 lane rcc bridge on chilla pashulok motor road near ganga bhogpur over been river in yamkeshwar constituency of pauri garhwal district as per cm ghosna no. 155/2018 under central road infrastructure fund in state of uttarakhand
Construction of 150m, 2 lane rcc bridge on chilla pashulok motor road near ganga bhogpur over been river in yamkeshwar constituency of pauri garhwal district as per cm ghosna no. 155/2018 under central road infrastructure fund in state of uttarakhand
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreConstruction of innovative scheme with 2 nos sbdtw,1 no. raw water reservoir with pump house and iron removal plant at newly constructed dm office complex , dharmanagar (n) district during the year 2024-25. (deposit work)
Construction of innovative scheme with 2 nos sbdtw,1 no. raw water reservoir with pump house and iron removal plant at newly constructed dm office complex , dharmanagar (n) district during the year 2024-25. (deposit work)
Read moreConstruction of 2 nos rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0 phase-iii within amc
Construction of 2 nos rcc ohr along with land development approach road guard room and boundary&#x0d wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreCanal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme
Canal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme
Read moreConstruction work of 5 seater public toilet and 2 urinals near chhibramau bus stop/intersection in ward no. 1 and 3 harshnagar/indaranagar.
Construction work of 5 seater public toilet and 2 urinals near chhibramau bus stop/intersection in ward no. 1 and 3 harshnagar/indaranagar.
Read moreConstruction of retaining wall on drain side near garden at shiv sagar in ward no. 79 under zone no. 21
Construction of retaining wall on drain side near garden at shiv sagar in ward no. 79 under zone no. 21
Read moreConstruction of new buildings at (1) swgh at maharanipeta (v) (m), (2) swbh at kummaripalem (v) of bheemunipatnam (m) in visakhapatnam district, (3) swgh at s.kota (4) swbh at venkatapuram road (v) of gajapathinagaram (m) vizianagaram district and (5) swbh at b i-pass colony (v) of parvathipuram (m) in manyam district as package-i under pm-ajay (5 nos), estimate cost: rs. 1950.00 lakhs
Construction of new buildings at (1) swgh at maharanipeta (v) (m), (2) swbh at kummaripalem (v) of bheemunipatnam (m) in visakhapatnam district, (3) swgh at s.kota (4) swbh at venkatapuram road (v) of gajapathinagaram (m) vizianagaram district and (5) swbh at b i-pass colony (v) of parvathipuram (m) in manyam district as package-i under pm-ajay (5 nos), estimate cost: rs. 1950.00 lakhs
Read moreConstruction of new buildings for 1) sw post matric girls hostel at palamaner, 2) sw post matric boys hostel at gudiyatham road, palamamer in chittoor district, 3) sw pre matric girl hostel at proddatur, 4) sw pre matric boys hostel at kalasapadu in ysr kadapa district, 5) sw pre matric girls hostel at manubolu in spsr nellore district and 6) sw pre matric boys hostel at tirupati as package -v (6 nos) under pm ajay - esti.rs.1800.00 lakhs
Construction of new buildings for 1) sw post matric girls hostel at palamaner, 2) sw post matric boys hostel at gudiyatham road, palamamer in chittoor district, 3) sw pre matric girl hostel at proddatur, 4) sw pre matric boys hostel at kalasapadu in ysr kadapa district, 5) sw pre matric girls hostel at manubolu in spsr nellore district and 6) sw pre matric boys hostel at tirupati as package -v (6 nos) under pm ajay - esti.rs.1800.00 lakhs
Read moreof your Industry type