Tender Details
Particulars | Details |
---|---|
Title |
Dis Assembling, Loading Unloading Of Material Track And Transportation Of Wooden Sleeper And Laying Fitting, Fixing, Installation And Packing Of Material Track Line In Seam V, Seam Iv(m) And Seam Iv(b) At Saoner Mine No.2
|
Description |
Dis Assembling, Loading Unloading Of Material Track And Transportation Of Wooden Sleeper And Laying Fitting, Fixing, Installation And Packing Of Material Track Line In Seam V, Seam Iv(m) And Seam Iv(b) At Saoner Mine No.2
|
Organisation | Western Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_WCL_319644_1 |
Reference Number |
na3259-Min-e-tender 01-2024-25 |
Tender Fee | 0 |
EMD | 2500 |
Tender Value | |
Place | Saoner Mine No.2 |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=331324 |
Start Date | October 25, 2024 16:30 |
End Date |
31/10/2024 ( Expired 195 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Re organization of track line by installation of track line contractually from 9l to 24l along with contractual supply of dog nail nut bolt and fish plate by laying transportation and fitting of chora block incline colliery under kenda area ecl
Re organization of track line by installation of track line contractually from 9l to 24l along with contractual supply of dog nail nut bolt and fish plate by laying transportation and fitting of chora block incline colliery under kenda area ecltr
Read moreLoading, transportation and unloading of ck300d shovel m/c sl. no. b-768/ exc-2940 from dhori area to sirka ocp, argada area. using low bed trailer.
Loading, transportation and unloading of ck300d shovel m/c sl. no. b-768/ exc-2940 from dhori area to sirka ocp, argada area. using low bed trailer.
Read moreSinking of borewell (200.00 mtr depth) with installation of submersible pump and laying of 75mm dia. hdpe pipe-line (supplying, fitting and fixing) at purshabauripara within ward no-37 under dmc.
Sinking of borewell (200.00 mtr depth) with installation of submersible pump and laying of 75mm dia. hdpe pipe-line (supplying, fitting and fixing) at purshabauripara within ward no-37 under dmc.
Read moreProviding and fixing steel buffers on both side of middle ramp, in front of shops of a, b, c block for protection of loading/unloading platform and to providing clear passage to the users of the market yard i/c laying rmc at a-block nsm azadpur
Providing and fixing steel buffers on both side of middle ramp, in front of shops of a, b, c block for protection of loading/unloading platform and to providing clear passage to the users of the market yard i/c laying rmc at a-block nsm azadpur
Read moreConstruction of 43 nos. of rcc sectionalisation stoppings (26 nos. rcc sectionalisation preparatory stoppings and 17 nos. rcc sectionalisation stoppings) in seam iv (b) and seam iv (m) and seam v of saoner mine no. 2, nagpur area
Construction of 43 nos. of rcc sectionalisation stoppings (26 nos. rcc sectionalisation preparatory stoppings and 17 nos. rcc sectionalisation stoppings) in seam iv (b) and seam iv (m) and seam v of saoner mine no. 2, nagpur area
Read moreConstruction of 68 nos. of ventilation stoppings with acc blocks at 0lw, -5lw, 68d/2lw, 2lw/68d and 7lw/68d district of seam iv(m), and -4lw/59r districts of seam iv(b) at saoner mine no. 3, of saoner sub area of nagpur area
Construction of 68 nos. of ventilation stoppings with acc blocks at 0lw, -5lw, 68d/2lw, 2lw/68d and 7lw/68d district of seam iv(m), and -4lw/59r districts of seam iv(b) at saoner mine no. 3, of saoner sub area of nagpur area
Read moreDismantling, loading, unloading, laying of track line its accessories and dismantling, loading, unloading, transportation of pvc belt and its accessories from 25 lw panel then installation in proposed depillaring panel 40le.
Dismantling, loading, unloading, laying of track line its accessories and dismantling, loading, unloading, transportation of pvc belt and its accessories from 25 lw panel then installation in proposed depillaring panel 40le.
Read moreInstallation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Installation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Read moreLaying of track line in mk seam of including transportation of line, sleeper from surface or old working of mine, providing dog nail mafish plates, nut bolts for fish plate, grading and line packing and repair/ maintenance of existing track line.
Laying of track line in mk seam of including transportation of line, sleeper from surface or old working of mine, providing dog nail mafish plates, nut bolts for fish plate, grading and line packing and repair/ maintenance of existing track line.
Read moreDismantling, laying, periodical shortening, line packing and cleaning of haulage track along 15ls from -22rise to 40dip and -40dip from 15ls to 28l roadway in propose (-)39dip dep. panel in seam c at kurja sheetaldhara ug mine. quantity laying 995.0
Dismantling, laying, periodical shortening, line packing and cleaning of haulage track along 15ls from -22rise to 40dip and -40dip from 15ls to 28l roadway in propose (-)39dip dep. panel in seam c at kurja sheetaldhara ug mine. quantity laying 995.0
Read moreof your Industry type