Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Protection Work At Waterlogging Stretches At Km14.500 To Km. 17.400 (Lhs) And Km. 14.500 To Km. 16.200 (Rhs) On 6 Lane Uer2 Nh344 M Pkg2 Karala Kanjhawala Road To Najafgarh Nangloi Road Km 15.000 To 28.450 In Delhi On Item Rate (Percentage) Basis.
|
Description |
Protection Work At Waterlogging Stretches At Km14.500 To Km. 17.400 (Lhs) And Km. 14.500 To Km. 16.200 (Rhs) On 6 Lane Uer2 Nh344 M Pkg2 Karala Kanjhawala Road To Najafgarh Nangloi Road Km 15.000 To 28.450 In Delhi On Item Rate (Percentage) Basis.
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2025_NHAI_233883_1 |
Reference Number |
NHAI/PIU Dwarka /UER-II/ Pkg-2 |
Tender Fee | 10000 |
EMD | 74 Lakh |
Tender Value | |
Place | NHAI HQ |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=264776 |
Start Date | April 28, 2025 21:00 |
End Date |
26/06/2025 ( Expired 11 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of balance works for 4 lane palanpur-radhanpur-samakhiyali section of nh-27 from km 430.10 to km 536.00 in the state of gujarat on tot mode (tot bundle-5a2) on item rate (percentage) basis at the risk and cost of concessionaire
Construction of balance works for 4 lane palanpur-radhanpur-samakhiyali section of nh-27 from km 430.10 to km 536.00 in the state of gujarat on tot mode (tot bundle-5a2) on item rate (percentage) basis at the risk and cost of concessionaire
Read moreRepair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town from km 565.850 to km 569.600 of east-west corridor of nh-27 (old nh-14) in the state of gujarat on item rate (percentage) basis at risk and cost of contractor
Repair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town from km 565.850 to km 569.600 of east-west corridor of nh-27 (old nh-14) in the state of gujarat on item rate (percentage) basis at risk and cost of contractor
Read moreCs for ae for supervision of const. of 4 n 6 lane gf connectivity from talwara jattan vill on nh44 to gobindsar vill on delhi amritsar katra expressway km 0.000 to km 12.345 (pathankot link road) in punjab on epc mode under nh(o)2nd call
Cs for ae for supervision of const. of 4 n 6 lane gf connectivity from talwara jattan vill on nh44 to gobindsar vill on delhi amritsar katra expressway km 0.000 to km 12.345 (pathankot link road) in punjab on epc mode under nh(o)2nd call
Read moreShort term oandm work of 4/6 lanning of karodi (km 320.104) to telwadi (km 375.000) road of nh-211 (new nh no. 52) (existing length 54.896 km design length 55.610 km) in the state of maharashtra under nhdp phase iv-b on item rate (percentage) basis
Short term oandm work of 4/6 lanning of karodi (km 320.104) to telwadi (km 375.000) road of nh-211 (new nh no. 52) (existing length 54.896 km design length 55.610 km) in the state of maharashtra under nhdp phase iv-b on item rate (percentage) basis
Read moreProtection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.
Protection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.
Read moreOperation and maintenance of 6-lane badarpur elevated highway (including service roads ramps approaches pups toilets and parks) on delhi agra section of nh-2 from km.16.100 to 20.500 in the state of delhi and haryana on item rate basis.
Operation and maintenance of 6-lane badarpur elevated highway (including service roads ramps approaches pups toilets and parks) on delhi agra section of nh-2 from km.16.100 to 20.500 in the state of delhi and haryana on item rate basis.
Read moreO and mincluding routine maintenance and incident management of four lane nagpur wainganga bridge section from km 498.000 to km 544.200 of nh-53 in the state of maharashtra on item rate percentage.
O and mincluding routine maintenance and incident management of four lane nagpur wainganga bridge section from km 498.000 to km 544.200 of nh-53 in the state of maharashtra on item rate percentage.
Read moreConstruction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.
Construction of rcc drain from km 642.800 to km 643.100 lhs along islampura area in navapur town and construction of rcc drain and box culvert in between pier p-2 and p-3 of rob at km 630.832 for existing nallah on item rate percentage basis.
Read moreRepair and maintenance works on damaged sections of 4-lane ahmedabad-godhra section of nh-47 from km 60.00 to km 105.00 (length 45.0 km) in the state of gujarat on item rate (percentage) basis at the risk and cost of contractor
Repair and maintenance works on damaged sections of 4-lane ahmedabad-godhra section of nh-47 from km 60.00 to km 105.00 (length 45.0 km) in the state of gujarat on item rate (percentage) basis at the risk and cost of contractor
Read moreRepair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town between km 565.85 to km 569.60 (length 3.75 km) on east-west corridor of nh-27 (old nh-14) in gujarat on item rate (percentage) basis at risk and cost of contr
Repair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town between km 565.85 to km 569.60 (length 3.75 km) on east-west corridor of nh-27 (old nh-14) in gujarat on item rate (percentage) basis at risk and cost of contr
Read moreof your Industry type