Tender Details
Particulars | Details |
---|---|
Title |
Mtps I M I Circle Ca Fp Replacement Of Worn Out Puncture Headers Pipelines In Hydrant Emulsifyre System By Dismantling And Erection Of Various Sizes Pipelines Patch Welding Replacement Of Fire Hydrant Post Removing Of Slabs And Allied Works
|
Description |
Mtps I M I Circle Ca Fp Replacement Of Worn Out Puncture Headers Pipelines In Hydrant Emulsifyre System By Dismantling And Erection Of Various Sizes Pipelines Patch Welding Replacement Of Fire Hydrant Post Removing Of Slabs And Allied Works
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_526118_1 |
Reference Number |
CE / MTPS-I / SE / M-I / CA / OT. 298 / 2024 -25 |
Tender Fee | 0 |
EMD | 7100 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=631675 |
Start Date | March 07, 2025 00:15 |
End Date |
12/03/2025 ( Expired 61 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i m i ca cws i replacement of corroded worn out gi safety hand rails toe guards and safety grills inside ct id fan stack area and allied works
Mtps i m i ca cws i replacement of corroded worn out gi safety hand rails toe guards and safety grills inside ct id fan stack area and allied works
Read moreMtps i m i circle ca fire protection checking of deluge valves cleaning of spray nozzles in emulsifyre system of gts uats mots cots and dots of unit i to iv etc
Mtps i m i circle ca fire protection checking of deluge valves cleaning of spray nozzles in emulsifyre system of gts uats mots cots and dots of unit i to iv etc
Read moreFabrication, dismantling and erection of h2so4 pipelines of sizes up to 300nb by tig welding in so2 or dcda acid plant.
Fabrication, dismantling and erection of h2so4 pipelines of sizes up to 300nb by tig welding in so2 or dcda acid plant.
Read moreMtps i m i circle ca fp replacement of worn out puncture headers pipelines in hydrant emulsifyre system by dismantling and erection of various sizes pipelines patch welding replacement of fire hydrant post removing of slabs and allied works
Mtps i m i circle ca fp replacement of worn out puncture headers pipelines in hydrant emulsifyre system by dismantling and erection of various sizes pipelines patch welding replacement of fire hydrant post removing of slabs and allied works
Read moreMtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom in mill 1d
Mtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom in mill 1d
Read moreMtps i mill plant unit ii cutting removing of existing worn out mill separator curved liners and erection of new ms liners in mill 2a to 2f during coh 2024 25
Mtps i mill plant unit ii cutting removing of existing worn out mill separator curved liners and erection of new ms liners in mill 2a to 2f during coh 2024 25
Read moreMtps i mill plant unit ii complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom in any mill 2a to 2f of unit ii
Mtps i mill plant unit ii complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom in any mill 2a to 2f of unit ii
Read moreTtps operation circle cad water leak arresting by patch welding clamping the punctured portion of various sizes of sea water, service water and raw water pipe lines and replacement of 300,200,150nb pipelines and overhauling of 100nb gate valves
Ttps operation circle cad water leak arresting by patch welding clamping the punctured portion of various sizes of sea water, service water and raw water pipe lines and replacement of 300,200,150nb pipelines and overhauling of 100nb gate valves
Read moreMtps i m i ca cws i replacement of corroded worn out gi safety hand rails and toe guards inside ct id fan stack area and hot rolled sheet in ct id fan door of cooling tower unit ii during coh 2024 2025
Mtps i m i ca cws i replacement of corroded worn out gi safety hand rails and toe guards inside ct id fan stack area and hot rolled sheet in ct id fan door of cooling tower unit ii during coh 2024 2025
Read moreMtps i mill plant unit iv complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft renewal of worm gear hub in any one mill from 4a to 4f tilt
Mtps i mill plant unit iv complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft renewal of worm gear hub in any one mill from 4a to 4f tilt
Read moreof your Industry type