Mtps I M I Circle Ca Fp Replacement Of Worn Out Puncture Headers Pipelines In Hydrant Emulsifyre System By Dismantling And Erection Of Various Sizes Pipelines Patch Welding Replacement Of Fire Hydrant Post Removing Of Slabs And Allied Works
|
| Description |
Mtps I M I Circle Ca Fp Replacement Of Worn Out Puncture Headers Pipelines In Hydrant Emulsifyre System By Dismantling And Erection Of Various Sizes Pipelines Patch Welding Replacement Of Fire Hydrant Post Removing Of Slabs And Allied Works
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_526118_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / CA / OT. 298 / 2024 -25 |
| Tender Fee | 0 |
| EMD | 7100 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=631675 |
| Start Date | March 07, 2025 00:15 |
| End Date |
Expired
12/03/2025
Expired 584 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Read moreMtps i mill plant unit iii complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 3a 3b 3c 3f tilting work
Mtps i mill plant unit iii complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 3a 3b 3c 3f tilting work
Read moreMtps i m i circle ca fp replacement of wornout punctured headers pipelines in hydrant emulsifyre system service water and auxiliary cooling water system etc
Mtps i m i circle ca fp replacement of wornout punctured headers pipelines in hydrant emulsifyre system service water and auxiliary cooling water system etc
Read moreDismantling and replacement of damaged worn out 150nb fire hydrant pipelines in unit i ii boiler esp area
Dismantling and replacement of damaged worn out 150nb fire hydrant pipelines in unit i ii boiler esp area
Read moreReplacement of damaged/worn out various size fire hydrant and spray pipelines at various locations of ph-iv, stps, sarni.
Replacement of damaged/worn out various size fire hydrant and spray pipelines at various locations of ph-iv, stps, sarni.
Read moreMtps ii mech ii chp ii fire protection system replacement of worn out fire hydrant pipe lines at ptp area of mtps-ii including supply erection fabrication and commissioning
Mtps ii mech ii chp ii fire protection system replacement of worn out fire hydrant pipe lines at ptp area of mtps-ii including supply erection fabrication and commissioning
Read moreCustom bid for services - rerouting and replacement of fire hydrant pipelines in fire protection sy
Read more
Erection and commissioning of spray nozzles and replacement of pipelines of fire hydrant network of boilers.
Erection and commissioning of spray nozzles in the channels of unit 9 and replacement of pipelines of fire hydrant network of tpp boiler.
Read moreMtps i m ii chp i bhel locomotive no 4 removing the auxiliary generator and overhauling by replacing worn out bearings other spares etc
Mtps i m ii chp i bhel locomotive no 4 removing the auxiliary generator and overhauling by replacing worn out bearings other spares etc
Read moreMtps i mill plant unit iii complete inspection of mill internals reconditioning renewal of worn out parts and bearings replacement of worn out worm wheel with worm shaft etc
Mtps i mill plant unit iii complete inspection of mill internals reconditioning renewal of worn out parts and bearings replacement of worn out worm wheel with worm shaft etc
Read moreof your Industry type