Tender Details

Particulars Details
Title
Mtps I Bm Unit Ii Boiler Pressure Parts Coh 2024 Inspection And Rectification Of Worn Out Lines And Bends Of Super Heater Header Drain Lines Etc
Description
Mtps I Bm Unit Ii Boiler Pressure Parts Coh 2024 Inspection And Rectification Of Worn Out Lines And Bends Of Super Heater Header Drain Lines Etc
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_488219_1
Reference
Number
CE / MTPS-I / SE / M-I / BM /OT.174 / 2024-25
Tender Fee 0
EMD 6800
Tender Value
Place Mettur Thermal Power Station-I / Mettur Dam
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=580173
Start Date September 25, 2024 23:30
End Date

09/10/2024 ( Expired 214 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rectification/repairing and reconditioning of different size of valves valve spares, repairing of valve blocks, fabrication of adapter below eco hopper and machining of super heater drain valves etc. during capital overhauling of boiler of u6

Rectification/repairing and reconditioning of different size of valves valve spares, repairing of valve blocks, fabrication of adapter below eco hopper and machining of super heater drain valves etc. during capital overhauling of boiler of u6

Read more
Supply of support insulator heater and shaft insulator heater for esp in unit i and ii

Supply of support insulator heater and shaft insulator heater for esp in unit i and ii

Read more
Supervisory service work for boiler pressure parts, safety valves and esp during capital overhauling of unit no. 06 of 2x250mw, ctps, ptpp, parichha jhansi

Supervisory service work for boiler pressure parts, safety valves and esp during capital overhauling of unit no. 06 of 2x250mw, ctps, ptpp, parichha jhansi

Read more
Mtps i bm unit i boiler pressure parts aoh 2025 erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers

Mtps i bm unit i boiler pressure parts aoh 2025 erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers

Read more
Mtps i bm unit i boiler pressure parts aoh 2025 dismantling cleaning and rectification of defective seal trough seal plates ss woven wire mesh providing patch plate

Mtps i bm unit i boiler pressure parts aoh 2025 dismantling cleaning and rectification of defective seal trough seal plates ss woven wire mesh providing patch plate

Read more
Mtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26

Mtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26

Read more
Mtps i tm unit i overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit i during aoh 2025 26

Mtps i tm unit i overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit i during aoh 2025 26

Read more
Mtps i bm unit i rotating parts annual maintenance 2025 26 removal and renewal of insulation in fg ducts air ducts and air pre heaters

Mtps i bm unit i rotating parts annual maintenance 2025 26 removal and renewal of insulation in fg ducts air ducts and air pre heaters

Read more
Mtps i bm unit i boiler pressure parts aoh 2025 cleaning of boiler structures from 0 to 52 m level etc

Mtps i bm unit i boiler pressure parts aoh 2025 cleaning of boiler structures from 0 to 52 m level etc

Read more
Mtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau

Mtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise