Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Third Party Quality Supervision/Control/Assurance Services For The Work Construction Of Approach Road And Drainage Facility To New Plot Under Development Near Outer Bulb(bot Railway Bulb Located Outside Gate No 1) From Jswptpl Tippler Side.
|
Description |
Third Party Quality Supervision/Control/Assurance Services For The Work Construction Of Approach Road And Drainage Facility To New Plot Under Development Near Outer Bulb(bot Railway Bulb Located Outside Gate No 1) From Jswptpl Tippler Side.
|
Organisation | Central Public Procurement Portal 1 |
Tender Id | 2023_MoS_761170_1 |
Reference Number |
CE/HWD-III/ACCTS-04/23/329 |
Tender Fee | 500 |
EMD | 11445 |
Tender Value | |
Place | In the chamber of CE,PPA |
Link | https://eprocure.gov.in |
Start Date | July 10, 2023 22:30 |
End Date |
01/08/2023 ( Expired 690 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Third party inspection and quality supervision/control/ assurance for the works
1. providing connecting road leading from gate no.3 to gate no.4 alongside the pict railway track inside harbour area.
 2. development of new road along with drain in cd plots for easy movement of cargo through ipt/dumpers.
Read moreThird party quality supervision/control/as surance services for the work-development of storage plot near gate no.2 alongside creek.
Third party quality
 supervision/control/as
 surance services for
 the work-development of
 storage plot near gate
 no.2 alongside creek.
Read moreRendering third party quality assurance services (tpqas)
Rendering third party quality assurance services tpqas for
 construction of new building basement plus g plus 6 floors by demolishing the existing tdce 
 rac building at iitm, construction of 100 nos of new e e1 type staff quarters s plus 10 floors
Read more(1) development of approach road from 2nd college gate to in front of new building at regional dental college, ghy-32 (2) construction of retaining wall along the drain from the exit gate to back side of grade-iv quarters at regional dental college
(1) development of approach road from 2nd college gate to in front of new building at regional dental college, ghy-32 (2) construction of retaining wall along the drain from the exit gate to back side of grade-iv quarters at regional dental college
Read moreThird party quality supervision/control/assurance servicess for the work development of plot near cd area adjacent to atbk-2 inside harbour area at paradip port
Third party quality supervision/control/assurance servicess for the work development of plot near cd area adjacent to atbk-2 inside harbour area at paradip port
Read moreThird party quality supervision/control/assurance services for the work repair and maintenance to the net barrier from gate no.2 to gate no.3
Third party quality supervision/control/assurance services for the work repair and maintenance to the net barrier from gate no.2 to gate no.3
Read moreThird party inspection and quality supervision /control/ assurance for the works development of new rehabilitation plot with construction of box culvert and bituminous approach road near ppl main entry gate
Third party inspection and quality supervision /control/ assurance for the works development of new rehabilitation plot with construction of box culvert and bituminous approach road near ppl main entry gate
Read moreThird party quality supervision/control/assurance services for the work construction of approach road and drainage facility to new plot under development near outer bulb(bot railway bulb located outside gate no-1) from jswptpl tippler side.
Third party quality supervision/control/assurance services for the work construction of approach road and drainage facility to new plot under development near outer bulb(bot railway bulb located outside gate no-1) from jswptpl tippler side.
Read moreConstruction of approach road and drainage facility to new plot under development near outer bulb(bot railway bulb located outside gate no-1) from jswptpl tippler side
Construction of approach road and drainage facility to new plot under development near outer bulb(bot railway bulb located outside gate no-1) from jswptpl tippler side
Read moreConstruction of approach road and drainage facility to new plot under development near outer bulb(bot railway bulb located outside gate no-1) from jswptpl tippler side
Construction of approach road and drainage facility to new plot under development near outer bulb(bot railway bulb located outside gate no-1) from jswptpl tippler side
Read moreof your Industry type