Tender Details
Particulars | Details |
---|---|
Title |
Improvement To Pound Nigdoli Nadode Nh 4 To Wavandhal Pali Road To Sh 79 Mdr 116 Km. 0/00 To 1/000 Tal Khalapur Dist Raigad
|
Description |
Improvement To Pound Nigdoli Nadode Nh 4 To Wavandhal Pali Road To Sh 79 Mdr 116 Km. 0/00 To 1/000 Tal Khalapur Dist Raigad
|
Organisation | Public Works Region | State Govt. and UT |
Tender Id | 2024_PWR_1050612_1 |
Reference Number |
PD/AB/TC e-Ten Notice No. 04 for 2024-2025Recall |
Tender Fee | 1180 |
EMD | 1.5 Lakh |
Tender Value | |
Place | Panvel |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1834551 |
Start Date | July 10, 2024 19:30 |
End Date |
18/07/2024 ( Expired 326 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConsultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 lada to bameng 0 000 to 43 65 43 65 km
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 lada to bameng 0 000 to 43 65 43 65 km
Read moreConstruction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Read moreConstruction of c.d.work improvement to s .h 209 to bangarwadi road km 0/00 to 4/570 vr-147 tq.kallam
Construction of c.d.work improvement to s .h 209 to bangarwadi road km 0/00 to 4/570 vr-147 tq.kallam
Read moreImprovement construction of existing cl 5 road to nh intermediate lane specification with hard shoulder from existing km 00 000 to km 75 991 design km 00 000 to km 73 830 design length 73.830 km of nh 505 sumdo kaza gramphoo road in the state of hp.
Improvement construction of existing cl 5 road to nh intermediate lane specification with hard shoulder from existing km 00 000 to km 75 991 design km 00 000 to km 73 830 design length 73.830 km of nh 505 sumdo kaza gramphoo road in the state of hp.
Read moreConstruction of concrete road and paved shoulders (palkhi marg) on dahanu jawahar trimbakeshwar nashik aurangabad sixlane road sh-30 km. 120/00 to 137/500 tal. trimbakeshwar and nashik dist- nashik
Construction of concrete road and paved shoulders (palkhi marg) on dahanu jawahar trimbakeshwar nashik aurangabad sixlane road sh-30 km. 120/00 to 137/500 tal. trimbakeshwar and nashik dist- nashik
Read moreOne time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
One time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana
Read moreImprovement to road from karmala road to thoratwasti kave ch.0/00 to 2/000 , tal. madha, dist. solapur
Improvement to road from karmala road to thoratwasti kave ch.0/00 to 2/000 , tal. madha, dist. solapur
Read more1. improvements to road from km 0/75 to 2/25 4/8 to 5/4 of allur to main road nandikotkur in nandyal district. 2. improvements to road from km 0/0 to 10/6 of brahmanakotkur midthur road in nandyal district.
1. improvements to road from km 0/75 to 2/25 4/8 to 5/4 of allur to main road nandikotkur in nandyal district. 2. improvements to road from km 0/0 to 10/6 of brahmanakotkur midthur road in nandyal district.
Read moreImprovement to maloshi to padekarwadi road v.r.-03. tal.-patan dist.-satara. ch 0/000 to ch 4/000
Improvement to maloshi to padekarwadi road v.r.-03. tal.-patan dist.-satara. ch 0/000 to ch 4/000
Read moreof your Industry type