Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Clearing The Drains Free Of Coal Dust, Silt, Slush, Debris Etc. In And Around Primary Crusher House 1and 2 Transfer Towers 2 And 7 And Junction Tower 20
|
Description |
Clearing&Amp#X0d
The Drains Free Of Coal Dust, Silt, Slush, Debris Etc. In And Around&Amp#X0d
Primary Crusher House 1and 2 Transfer Towers 2 And 7 And Junction Tower 20
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_531084_1 |
Reference Number |
CE SE C TTPS Spec. No 27 25 26 |
Tender Fee | 0 |
EMD | 5000 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=632194 |
Start Date | March 08, 2025 17:30 |
End Date |
14/03/2025 ( Expired 107 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Hiring of jcb poclain truck dumper roller crane for clearing and removing debris soil rubbles etc underneath and around water main service road, dams etc in various sections under e e operations in o c division
Hiring of jcb poclain truck dumper roller crane for clearing and removing debris soil rubbles etc underneath and around water main service road, dams etc in various sections under e e operations in o c division
Read moreRemoval and clearing of sludge, slush silt, debris, plastic waste, water weeds, in proposed mcc site at compost yard in ward -1 in aranthangi municipality.
Removal and clearing of sludge, slush silt, debris, plastic waste, water weeds, in proposed mcc site at compost yard in ward -1 in aranthangi municipality.
Read moreRate contract for cleaning of accumulated tree leaves silt dust debris etc from ms roof gutters asbestos sheets roofing down take pipes mangalore roof tiles roof rcc slab in isp factory and disposing taken out material to ..
Rate contract for cleaning of
 accumulated tree leaves silt dust debris etc from ms roof
 gutters asbestos sheets roofing down take pipes mangalore
 roof tiles roof rcc slab in isp factory and disposing taken
 out material to ..
Read moreAnnual work of maintenance , watch and ward of all the gardens, landscaping lawns, rosery nursery etc. situated in the residential premises sector no. 2, sector no. 3 to 7 and within power house premises for the year 2025-26 at stps, sarni.
Annual work of maintenance , watch and ward of all the gardens, landscaping lawns, rosery nursery etc. situated in the residential premises sector no. 2, sector no. 3 to 7 and within power house premises for the year 2025-26 at stps, sarni.
Read moreCleaning of drains and swe...
Cleaning of drains and sweeping of roads, paths, cleaning of trash racks at cw pump house and cooling towers, cleaning of stairs, railings etc. and work of 24x7 water supply in plant and non-plant buildings
Read more1)watering and maintaining the plants, lawns in front of control room, guest house along the peripheral road and approach road etc., at 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026 and 2) cleaning maintenance of control room ,ground floor office rooms, dg room, guest house, bath rooms, water closets and all drains etc., in the premises of 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026.
1)watering and maintaining the plants, lawns in front of control room, guest house along the peripheral road and approach road etc., at 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026 and 2) cleaning and maintenance of control room ,ground floor office rooms, dg room, guest house, bath rooms, water closets and all drains etc., in the premises of 400/220 kv dindi ss for the period from 01.05.2025 to 31.03.2026.
Read moreKtps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Read moreProviding assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.0
Providing assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.
Read moreProviding assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from
Providing assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.
Read moreRemoval and clearing of loose and jammed coal lumps, fines etc spilled f/b and belt conveyor accumulated in and around conveyor structure of f/b at kessurgarh under abocp mine of block - ii area
Removal and clearing of loose and jammed coal lumps, fines etc spilled f/b and belt conveyor accumulated in and around conveyor structure of f/b at kessurgarh under abocp mine of block - ii area
Read moreof your Industry type