Tender Details
Particulars | Details |
---|---|
Title |
Const C D Work On Approach Road To Bramhwadi (V R No 76) Tq Renapur Under 3054 Srf 2024 25
|
Description |
Const C D Work On Approach Road To Bramhwadi (V R No 76) Tq Renapur Under 3054 Srf 2024 25
|
Organisation | RDD-CEO-LATUR | State Govt. and UT |
Tender Id | 2024_LATUR_1123843_1 |
Reference Number |
ZPL/W/E-T/150/2024-25 |
Tender Fee | 1080 |
EMD | 24553 |
Tender Value | |
Place | TQ. RENAPUR |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1961593 |
Start Date | December 16, 2024 21:30 |
End Date |
30/12/2024 ( Expired 132 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreDesign and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Read moreChambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreDesljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Read moreWbpwd(r)/se/chc/nib-01/25-26/1 / collection of toll on shree gouranga setu over river bhagirathi at nabadwip in the district of nadia under nadia highway division no. i.
Collection of toll on shree gouranga setu over river bhagirathi at nabadwip in the district of nadia under nadia highway division no. i.
Read moreAAAAAAAAAA
Login to viewNirol - khatundidanga road from 0.00 kmp to 3.200 kmp odr, widening and strengthening work under burdwan north highway division in the district of purba bardhaman.
Read moreChambal alwar bharatpur water supply project package-iii based on hybrid annuity model (ham) ace(p) bharatpur nit no. 06/2024-25
Work of construction of cwr and block cwph at various locations for clusters laying of transfer main from block ps to block cps rising main from block cps to block esrs, construction of esrs laying of cluster distribution mains cabp pck 3 under jjm
Read moreImprovement of road from palku to sirduk (hrangkhawl para) via 1 no songtang, 2 no songtang and 3 no songtang under ridf xxx of nabard. (job no. tp/com/223/2024-25)
Improvement of road from palku to sirduk (hrangkhawl para) via 1 no songtang, 2 no songtang and 3 no songtang under ridf xxx of nabard. (job no. tp/com/223/2024-25)
Read moreof your Industry type