Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Ground Water Recharge Scheme To Augment Ground Water Table By Using Surplus New Pond Water At Jawaharke Rest House In Mansa District Of Punjab.
|
Description |
Construction Of Ground Water Recharge Scheme To Augment Ground Water Table By Using Surplus New Pond Water At Jawaharke Rest House In Mansa District Of Punjab.
|
Organisation | Department of Water Resources | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2590 |
EMD | 7560 |
Tender Value | |
Place | jawaharke |
Link |
AAAAAAAAAA Login to view |
Start Date | June 10, 2025 22:30 |
End Date |
24/06/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreInstallation of new tubewell civil work and ohsr at bifurcation of water supply scheme wanchari mh from existing water supply scheme varpal block verka district amritsar under nabard xxx
Installation of new tubewell civil work and ohsr at bifurcation of water supply scheme wanchari mh from existing water supply scheme varpal block verka district amritsar under nabard xxx
Read moreConstruction of rain water harvesting system at different places in ward no. 01 to 45
Construction of rain water harvesting system at different places in ward no. 01 to 45
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreJjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Jjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Read moreConstruction work of suspension bridge 90 mtr span at km 26, x/s 25/17 to 25/21 of panchkedar sri masta-madhmaheswar temple briddle path in kedarnath legislative assembly area in ukhimath block in district rudraprayag honble c.m. gosh.no. 438/2024
Construction work of suspension bridge 90 mtr span at km 26, x/s 25/17 to 25/21 of panchkedar sri masta-madhmaheswar temple briddle path in kedarnath legislative assembly area in ukhimath block in district rudraprayag honble c.m. gosh.no. 438/2024
Read moreSitc of bed cum passenger lift at ipd building_ opd building_ 2 nos mo quarter and 2 nos nurse quarter buildings
Construction of infrastructure up-gradation of kaliyaganj state general hospital from 60 beds to 250 beds at kaliyaganj in the district of uttar dinajpur - sitc of bed cum passenger lift at ipd building, opd building-2nos mo quarter and 2nos quarter
Read moreCa no.cwe bly/ge (e)/11 of 2025- 2026spl repair to bldg no p-339, p-340 incl water through in b charge and bldg no p-343 incl water through in new charge at rts and depot hempur under ge ( east) bareilly
Ca no.cwe bly/ge (e)/11 of 2025- 2026spl repair to bldg no p-339, p-340 incl water through in b charge and bldg no p-343 incl water through in new charge at rts and depot hempur under ge ( east) bareilly
Read moreConstruction of drain in ward 07 near water tank to santosh bansal house
Construction of drain in ward 07 near water tank to santosh bansal house
Read moreof your Industry type