Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Foot Over Bridge At Eleven Locations At Six Laning Of Varanasi Aurangabad Section Of Nh 2 From Km. 786.000 To Km. 978.400 In The State Of Up And Bihar On Epc Mode.
|
| Description |
Construction Of Foot Over Bridge At Eleven Locations At Six Laning Of Varanasi Aurangabad Section Of Nh 2 From Km. 786.000 To Km. 978.400 In The State Of Up And Bihar On Epc Mode.
|
| Organisation | Central Public Procurement Portal 2 |
| Tender Id | 2023_NHAI_169970_1 |
|
Reference Number |
NIT No- 213/RO-PATNA/NHAI/2023-24 |
| Tender Fee | 10000 |
| EMD | 24.44 Lakh |
| Tender Value | - |
| Place | NHAI RO - Patna |
| Link |
View Original Tender Notice
https://etenders.gov.in |
| Start Date | October 07, 2023 00:20 |
| End Date |
Expired
21/11/2023
Expired 1059 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Six laning of atkadih to gorhar section of nh 19 (old nh 2) from km 320.800 to km 326.160 in the state of jharkhand on epc mode
Six laning of atkadih to gorhar section of nh 19 (old nh 2) from km 320.800 to km 326.160 in the state of jharkhand on epc mode
Read moreBalance work of six laning of kagal satara section of nh 48 (old nh 4) package i from km 592.500 to km 658.000 in the state of maharashtra to be executed on epc mode under bharatmala pariyojana
Balance work of six laning of kagal satara section of nh 48 (old nh 4) package i from km 592.500 to km 658.000 in the state of maharashtra to be executed on epc mode under bharatmala pariyojana
Read moreSix laning of gandhidham (kandla) mundra port from km 0/000 to km 71/400 (length 71.40 km) section of nh41 in the state of gujarat on epc.
Six laning of gandhidham (kandla) mundra port from km 0/000 to km 71/400 (length 71.40 km) section of nh41 in the state of gujarat on epc.
Read moreSix-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Read moreUpgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.
Upgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.
Read moreSix-laning of hyderabad-vijayawada section of nh-65 section ch.39.85 to ch.221.15 (181.30 km) (pkg-1) in the states of telangana and andhra pradesh under bot mode
Six-laning of hyderabad-vijayawada section of nh-65 section ch.39.85 to ch.221.15 (181.30 km) (pkg-1) in the states of telangana and andhra pradesh under bot mode
Read moreConstruction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Construction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Read moreConstruction of 8 nos foot over bridges 3 nos bus shelters and drain at various locations on nh 503 and nh 303 in the state of himachal pradesh on epc mode
Construction of 8 nos foot over bridges 3 nos bus shelters and drain at various locations on nh 503 and nh 303 in the state of himachal pradesh on epc mode
Read moreHt line shifting work under risk and cost for rehabilitation and upgradation of pal phata phulambri khultabad section of 752h from km.137.758 to km.105.700 design ch. km. 46.440 to 78.358 in the state of maharashtra on epc mode.
Ht line shifting work under risk and cost for rehabilitation and upgradation of pal phata phulambri khultabad section of 752h from km.137.758 to km.105.700 design ch. km. 46.440 to 78.358 in the state of maharashtra on epc mode.
Read moreRisk and cost work for up gradation of paithan to shirur for section ch..00.00 to ch..55. 937 nh 752e to two lane with paved shoulders in the state of maharashtra on engineering, procurement and construction epc mode basis contract.
Risk and cost work for up gradation of paithan to shirur for section ch..00.00 to ch..55. 937 nh 752e to two lane with paved shoulders in the state of maharashtra on engineering, procurement and construction epc mode basis contract.
Read moreof your Industry type