Tender Details

Particulars Details
Title
Shifting Of Part A 1000 Gpm Pump Make Greaves Cotton And Kirloskar From One Place To Other Place At Same Location For Dismantling, Cutting Welding And Laying Of 150 Mtrs 6 Inch Dia And Make New Filling Point Installation At Chamatu Patch Near Co
Description
Shifting Of Part A 1000 Gpm Pump Make Greaves Cotton And Kirloskar From One Place To Other Place At Same Location For Dismantling, Cutting Welding And Laying Of 150 Mtrs 6 Inch Dia And Make New Filling Point Installation At Chamatu Patch Near Co
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_313178_1
Reference
Number
GM(MS)/SO(EnM)/e-NIT/24-25/34
Tender Fee 0
EMD 6920
Tender Value
Place Office of the Project Officer M-S Area, Bachra
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=324546
Start Date July 23, 2024 17:30
End Date

01/08/2024 ( Expired 287 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Dismantling laying pipe cutting jointing (welding) etc of 6 inch-300 mtr 8 inch dia-200 mtr 4 inch- 150 mtr. pipeline for shifting of pumps at main sump firefighting locations and others as and whenever required under ttk ocp rajhara area

Dismantling laying pipe cutting jointing (welding) etc of 6 inch-300 mtr 8 inch dia-200 mtr 4 inch- 150 mtr. pipeline for shifting of pumps at main sump firefighting locations and others as and whenever required under ttk ocp rajhara area

Read more
Overhauling and repairing of dsm-125/40, 1000 gpm pump and 500 gpm pump, dst 125/150, make kirloskar running for firefighting, tanker filling and plantation site at tallab under rohini project, nk area

Overhauling and repairing of dsm-125/40, 1000 gpm pump and 500 gpm pump, dst 125/150, make kirloskar running for firefighting, tanker filling and plantation site at tallab under rohini project, nk area

Read more
Shifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of 6 inch dia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area

Shifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of inchdia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area

Read more
Dismantling and di cum laying of 8 inch dia m.s. pipeline of the two nos. of 2000 g.p.m. pump motor sets, in the a patch in mine, suppplying water to the water tanker point, w.r.t. karo ocp, under bnk area

Dismantling and di cum laying of 8 inch dia m.s. pipeline of the two nos. of 2000 g.p.m. pump motor sets, in the a patch in mine, suppplying water to the water tanker point, w.r.t. karo ocp, under bnk area

Read more
Dismantling and re-arranging/joining 10 inch dia ms. pipe line of amal. nt-st jeenagora for providing one point source to kujama patch g of kujama colliery under lodna area .

Dismantling and re-arranging/joining 10 inch dia ms. pipe line of amal. nt-st jeenagora for providing one point source to kujama patch g of kujama colliery under lodna area .

Read more
Di / shifting and extension 6 inch dia existing and old dismantling 6 inch dia ms pipes 1000 mtrs (166 nos) 34 nos. bend 34 nos tepper /short piece dismantling from old rout ob dump and loading crrying laying and joining of 6 inch dia m.s. pip

Di / shifting and extension 6 inch dia existing and old dismantling 6 inch dia ms pipes 1000 mtrs (166 nos) 34 nos. bend 34 nos tepper /short piece dismantling from old rout ob dump and loading crrying laying and joining of 6 inch dia m.s. pip

Read more
Di and shifting of the digital flowmeter installed at the delivery pipeline of the 2000 gpm pump by dismantling, cutting and laying of 8 inch dia m.s. pipeline, in mine w.r.t. karo ocp, under bnk area

Di and shifting of the digital flowmeter installed at the delivery pipeline of the 2000 gpm pump by dismantling, cutting and laying of 8 inch dia m.s. pipeline, in mine w.r.t. karo ocp, under bnk area

Read more
Installation of 02 no. of 1000 gpm pump motor with accessories and dismantling, shifting, lying and jointing of 6-inch dia ms pipe including hose pipes and sluice valve for dewatering near 541 shovel and dragline face under sb project.

Installation of 02 no. of 1000 gpm pump motor with accessories and dismantling, shifting, lying and jointing of 6-inch dia ms pipe including hose pipes and sluice valve for dewatering near 541 shovel and dragline face under sb project.

Read more
(a) complete repairing/ overhauling of pl-iii 5 stage m and p make turbine -01 no. for pumping sl. no. bccl/jg/pump/1000 gpm/03 (b)complete repairing / rotating unit of 10 uph8 and 4000 gpm 150 mtrs head kirloskar make pump local id. no.bccl/ jg/pum

(a) complete repairing/ overhauling of pl-iii 5 stage m and p make turbine -01 no. for pumping sl. no. bccl/jg/pump/1000 gpm/03 (b)complete repairing / rotating unit of 10 uph8 and 4000 gpm 150 mtrs head kirloskar make pump local id. no.bccl/ jg/pum

Read more
Day to day shifting of 4 inch dia pipeline by dismantling, laying, cutting, jointing (welding) etc as per advancement of mine for firefighting at jamun dohar and repairing of existing pipeline as and when required for a period of one year under kdh

Day to day shifting of 4 inch dia pipeline by dismantling, laying, cutting, jointing (welding) etc as per advancement of mine for firefighting at jamun dohar and repairing of existing pipeline as and when required for a period of one year under kdh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise