Tender Details
Particulars | Details |
---|---|
Title |
478/Mog I/23
|
Description |
Construction Of Cover Drain From H/O Surat Ali To Hediyapota School At Hediyapota, Sansad I Under Mogra I Gram Panchayat.
|
Organisation | Government of West Bengal |
Tender Id | 2023_ZPHD_577350_1 |
Reference Number |
478/MOG-I/23 |
Tender Fee | 250 |
EMD | 3900 |
Tender Value | |
Place | MOGRA-I GRAM PANCHAYAT OFFICE |
Link | https://wbtenders.gov.in |
Start Date | September 26, 2023 15:30 |
End Date |
06/10/2023 ( Expired 592 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConstruction of drain from boundary of pwd rest house to chichli tiraha in rajendra babu ward, nagar palika parishad gadarwara
Construction of drain from boundary of pwd rest house to chichli tiraha in rajendra babu ward, nagar palika parishad gadarwara
Read moreIt addl. pune infotech park i industrial
Construction of 6 lane road using cement&#x0d concrete treatment with footpath and storm water pipeline&#x0d repairing and providing new curbing at center verge and&#x0d road furnitures from shivaji chowk to smashan bhumi&#x0d
Read moreConstruction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Construction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreDrain construction work from raees mithai to kalandar hotel under division no. 16 sanjay gandhi ward.
Drain construction work from raees mithai to kalandar hotel under division no. 16 sanjay gandhi ward.
Read moreof your Industry type