Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Turbine Supervisory Control System
|
| Description |
|
| Organisation | Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises |
| Tender Id | GEM/2025/B/6561415 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | August 12, 2025 15:42 |
| End Date |
Expired
22/08/2025
Expired 422 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Supervisory control and testing of samples from boiler, turbine, wctp and tbs at chemical laboratory, wctp.
Supervisory control and testing of samples from boiler, turbine, wctp and tbs at chemical laboratory, wctp.
Read moreSupply of materials for“ turbine supervisory & vibration monitoring system for 3 x 210 mw, kwu turbi,installation, testing & commissioning of“ turbine supervisory & vibration monitoring system for 3 x
Supply of materials for“ turbine supervisory & vibration monitoring system for 3 x 210 mw, kwu turbi,installation, testing & commissioning of“ turbine supervisory & vibration monitoring system for 3 x
Read moreSupervisory control and data acquisition (scada) lab kit
Supervisory control and data acquisition (scada) lab kit
Read moreRound the clock assistance in shift electrical operation of complete electrics and supervisory and technical control of cpp
Round the clock assistance in shift electrical operation of complete electrics and supervisory and technical control of cpp
Read moreTurbine flow meter,turbine flow meter,turbine flow meter
Turbine flow meter,turbine flow meter,turbine flow meter
Read moreImplementation automatic generation control on 4 gas turbine generators of 1500 mw pps iii bawana
As per tender documents
Read moreMain steam turbine control fluid system spares for accumulator bladder assembly model: s-35-b-m50-c,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,drive turbine governing oil system spares for accumulator bladder assembly model: s-35-b-m50-c-v cap
Main steam turbine control fluid system spares for accumulator bladder assembly model: s-35-b-m50-c,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,drive turbine governing oil system spares for accumulator bladder assembly model: s-35-b-m50-c-v cap
Read moreProcurement of main control valve (mcv) and auxiliary control valve (acv) of turbine driven boiler feed pump (tdbfp) of stpp, jaipur, mancherial, telangana.
Procurement of main control valve (mcv) and auxiliary control valve (acv) of turbine driven boiler feed pump (tdbfp) of stpp, jaipur, mancherial, telangana.
Read moreProcurement of main control valve (mcv) and auxiliary control valve (acv) of turbine driven boiler feed pump (tdbfp) of stpp, jaipur, mancherial, telangana.
Procurement of main control valve (mcv) and auxiliary control valve (acv) of turbine driven boiler feed pump (tdbfp) of stpp, jaipur, mancherial, telangana.
Read moreOperation and maintenance of phase-1 of scada (supervisory control and data acquisition) project of nlbc & hbc network for 1 year on turnkey basis
Operation and maintenance of phase-1 of scada (supervisory control and data acquisition) project of nlbc & hbc network for 1 year on turnkey basis
Read moreof your Industry type