Tender Details

About Tender

πŸš€ Tender Alert: High Pressure Jet Coach Cleaning Plant πŸš€ The Ministry Of Railways, Central Government, Invites Bids For The Procurement Of A High Pressure Jet Coach Cleaning Plant To Be Set Up At Hubli. πŸš‚ πŸ“… Bid Submission Deadline: July 15, 2024, 10:30 Am Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 114,990. πŸ’° Detailed Tender Documents, Including Specifications And Procedures, Are Available For Review. Bidders Are Expected To Comply With All The Terms And Conditions As Per The Tender Document. Keywords: High Pressure Jet Coach Cleaning Plant, Ministry Of Railways, Central Government, Tender, Hubli, Railways Infrastructure, Cleaning Equipment
Particulars Details
Title
High Pressure Jet Coach Cleaning Plant
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 106383119
Reference
Number
L8245966
Tender Fee 0
EMD 1.15 Lakh
Tender Value -
Place Hubli
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/supply/pdfdocs/072024/106383119/viewNitPdf_4613575.pdf

Start Date June 20, 2024 22:29
End Date
Expired 15/07/2024

Expired 819 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Procurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.

Procurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.

Read more
Vacuum transmitters and pressure transmitters for ahp

Vacuum transmitters and pressure transmitters for ahp

Read more
Supply of pressure/vacuum relief valves with hood for silo

Supply of pressure/vacuum relief valves with hood for silo

Read more
Tggenco-ktps-vii stage -tm- procurement of consumables for high pressure valves

Tggenco-ktps-vii stage -tm- procurement of consumables for high pressure valves

Read more
Procurement of fog cannon (mist sprayer) with 40 mtrs jet length for installation at crushers to control the emission of dust at the source and mist cannon dust suppression systems (80 to 100 mtrs jet length) at coal stock yard to suppress the dust particles at pkoc, manuguru area including cmc for 3 years- reg

Procurement of fog cannon (mist sprayer) with 40 mtrs jet length for installation at crushers to control the emission of dust at the source and mist cannon dust suppression systems (80 to 100 mtrs jet length) at coal stock yard to suppress the dust particles at pkoc, manuguru area including cmc for 3 years- reg

Read more
Out sourcing of nd testing, hydraulic pressure testing, calibration of pressure gauge and relief valve and shell thickness measurement of air reciever tanks of hemm working at kkocp for period of 3 years.

Out sourcing of nd testing, hydraulic pressure testing, calibration of pressure gauge and relief valve and shell thickness measurement of air reciever tanks of hemm working at kkocp for period of 3 years.

Read more
Ktps-v stage - i and c - laying of cables from ucb to seal air pressure transmitters and erection of impulse lines and structures for seal air pressure transmitters of mills of units 9 and 10.-reg

Ktps-v stage - i and c - laying of cables from ucb to seal air pressure transmitters and erection of impulse lines and structures for seal air pressure transmitters of mills of units 9 and 10.-reg

Read more
Supply of spares for pressure, temperature and flow switches in various locations of boiler and turbine areas

Supply of spares for pressure, temperature and flow switches in various locations of boiler and turbine areas

Read more
Bmd-service charges for online testing and pressure setting of boiler safety valves of 1x500 mw ktpp unit

Bmd-service charges for online testing and pressure setting of boiler safety valves of 1x500 mw ktpp unit

Read more
Hydraulic pressure testing of air receiver tanks of air compressors working at gdk-11 incline, rg.1 area

Hydraulic pressure testing of air receiver tanks of air compressors working at gdk-11 incline, rg.1 area

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise