Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Independent Engineer Services For Construction Of Western Bhopal Bypass As 4 Lane With Paved Shoulder Along With Service Road S From Km. 424 Of Jabalpur Bhopal Road (Nh 46) And End At Km.21 Of Bhopal Dewas Road (Sh 28) (Design Length 40.90 Km)
|
| Description |
Independent Engineer Services For Construction Of Western Bhopal Bypass As 4 Lane With Paved Shoulder Along With Service Road S From Km. 424 Of Jabalpur Bhopal Road (Nh 46) And End At Km.21 Of Bhopal Dewas Road (Sh 28) (Design Length 40.90 Km)
|
| Organisation | Madhya Pradesh Road Development Corporation Limited | State Govt. and UT |
| Tender Id | 2024_TAD_332647_1 |
|
Reference Number |
649 |
| Tender Fee | 31180 |
| EMD | 10 Lakh |
| Tender Value | - |
| Place | Bhopal |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=418039 |
| Start Date | July 29, 2024 21:00 |
| End Date |
Expired
05/08/2024
Expired 803 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for preparation of detailed project report for development of bhopal-jabalpur 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh.(project corridor length-240 km approximately) (package-b)
Consultancy services for preparation of detailed project report for development of bhopal-jabalpur 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh.(project corridor length-240 km approximately) (package-b)
Read moreConsultancy services for preparation of dpr for i widening upgradation to two lane with paved shoulder on nh 169a from km. 30.75 to km. 51.60 agumbe ghat, ii construction of two lane with paved shoulder for thirtahalli bypass starts on from nh169a
Consultancy services for preparation of dpr for i widening upgradation to two lane with paved shoulder on nh 169a from km. 30.75 to km. 51.60 agumbe ghat, ii construction of two lane with paved shoulder for thirtahalli bypass starts on from nh169a
Read moreConstruction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreConstruction of 4 lane with paved shoulder daudnagar bypass from km 93.915 to km 102.290 of nh 139 on naubatpur _ hariharganj road in the state of bihar on epc mode.
Construction of 4 lane with paved shoulder daudnagar bypass from km 93.915 to km 102.290 of nh 139 on naubatpur _ hariharganj road in the state of bihar on epc mode.
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for preparation of detailed project report for development of sagar-jabalpur 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh.(project corridor length-135 km approximately) (package-d)
Consultancy services for preparation of detailed project report for development of sagar-jabalpur 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh.(project corridor length-135 km approximately) (package-d)
Read moreConsultancy services for preparation of detailed project report for development of bhopal-gwalior 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh. (project corridor length-320 km approximately) (package-a)
Consultancy services for preparation of detailed project report for development of bhopal-gwalior 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh. (project corridor length-320 km approximately) (package-a)
Read moreCs for independent engineer for widening and upgradation of existing highway from khagaria design ch.270.000 to purnea ch.413.529 section of nh31-nh231 to 4 lane with paved shoulder under nho on bot (toll) in the state of bihar (2nd call)
Cs for independent engineer for widening and upgradation of existing highway from khagaria design ch.270.000 to purnea ch.413.529 section of nh31-nh231 to 4 lane with paved shoulder under nho on bot (toll) in the state of bihar (2nd call)
Read moreAbilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas
Abilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas
Read moreof your Industry type