Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🏗️ Invitation For Bids: Valley Side Protection Works On Nh 10 🏘️ The Ministry Of Road Transport And Highways, Under The Central Government, Invites Bids For The Execution Of Valley Side Protection Works On Nh 10, Specifically From Chainage (Ch.) 25.80 Km To 26.65 Km, 26.75 Km To 27.20 Km, And 27.41 Km To 27.48 Km In The District Of Kalimpong. These Works Are Aimed At Restoring The Damages Caused By The Flash Flood In 2023. 📅 Bid Submission Deadline: June 26, 2024, 5:00 Pm Tender Fee: Inr 10,000 Earnest Money Deposit (Emd): Inr 44,88,000 Eligible Bidders Are Requested To Submit Detailed Bids, Including Technical And Financial Proposals, In Accordance With The Epc (Engineering, Procurement, And Construction) Mode, As Specified In Job No. 548. Keywords: Nh 10, Valley Side Protection Works, Flash Flood Restoration, National Highway Division Ix, Ministry Of Road Transport And Highways, Epc Mode, Bid Submission, Tender Fee, Earnest Money DepositParticulars | Details |
---|---|
Title |
Valley Side Protection Works From Ch. 25.80 Km To Km 26.65, Km 26.75 To Km 27.20 And 27.41 Km To 27.48 Km To Restore Damages By Flash Flood In 2023 Of Nh 10 Under National Highway Division Ix In The District Of Kalimpong On Epc Mode, Job No.548.
|
Description |
Valley Side Protection Works From Ch. 25.80 Km To Km 26.65, Km 26.75 To Km 27.20 And 27.41 Km To 27.48 Km To Restore Damages By Flash Flood In 2023 Of Nh 10 Under National Highway Division Ix In The District Of Kalimpong On Epc Mode, Job No.548.
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id | 2024_MoRTH_810156_1 |
Reference Number |
WBPW_Rd/SE/NHC3/eRFP-3/2024-25 |
Tender Fee | 10000 |
EMD | 44.88 Lakh |
Tender Value | |
Place | Sevoke Rangpo Section |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=851424 |
Start Date | June 29, 2024 20:30 |
End Date |
23/07/2024 ( Expired 347 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreDevelop. of 4l badvel to nellore highway from badvel gopavaram vill on nh-67 ch.630.960 to guruvindapudi vill on nh16 ch.739.094 in ap on bot mode for a total length of 108.134 km
Develop. of 4l badvel to nellore highway from badvel gopavaram vill on nh-67 ch.630.960 to guruvindapudi vill on nh16 ch.739.094 in ap on bot mode for a total length of 108.134 km
Read moreRehabilitation and up-gradation from design ch km 35.300 to km 65.740 (length-30.440km) of nh-166g (gaganbawada to kale) to 2lps in the state of maharashtra on epc mode.
Rehabilitation and up-gradation from design ch km 35.300 to km 65.740 (length-30.440km) of nh-166g (gaganbawada to kale) to 2lps in the state of maharashtra on epc mode.
Read moreConst of realignment of nh87 new nh109 sec of rudrapur kathgodam ch.0.000 (exist km 54.050 of nh 87 to ch.7.875 exis km61.550 of nh 87 due to proposed expansion of pantnagar airport l7.875 km in uttarakhand in epc mode
Const of realignment of nh87 new nh109 sec of rudrapur kathgodam ch.0.000 (exist km 54.050 of nh 87 to ch.7.875 exis km61.550 of nh 87 due to proposed expansion of pantnagar airport l7.875 km in uttarakhand in epc mode
Read moreConstruction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Construction of bypass road to phulbani town from km. 29.800 (design ch. 0.0) to km. 39.000 (design ch. 7.250 ) of nh-157 in the state of odisha on epc mode
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from girmapur village (design ch.-1.518) to reddipalle village (designch.33.000) length of 34.518km in telangana under nh(o) on epc mode (package-i)
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Read moreDevelopment of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Read moreDevelopment of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from rayagiri village (design ch.125.000) to tangad palle village (design ch. 160.000) length of 35.000 km in telangana under nh(o) on epc mode (package-v)
Read moreof your Industry type