Tender Details

Particulars Details
Title
Widening 2 Lane To 4 Lane And Strengthening Of Itaunja Mahona Kumhrawan Kursi Dewa Chinhat Road M D R 088 C Ch. 18.500 To 45.850 In District Barabanki
Description
Widening 2 Lane To 4 Lane And Strengthening Of Itaunja Mahona Kumhrawan Kursi Dewa Chinhat Road M D R 088 C Ch. 18.500 To 45.850 In District Barabanki
Organisation Chief Engineer PWD Faizabad Zone | State Govt. and UT
Tender Id 2025_CEUFZ_1043796_1
Reference
Number
3309/1KAM(BARA)/Etender/2025 Date 14-05-2025
Tender Fee 2714
EMD 2.1 Crore
Tender Value
Place Barabanki
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1894151

Start Date May 29, 2025 17:30
End Date
Expired 21/06/2025

Expired 379 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Widening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500.

Widening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500

Read more
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Read more
S/r for sde residence and road and parking in the campus of pwd (bandr) colony at f. p. jhirka in nuh district

Sr for sde residence and road and parking in the campus of pwd(bandr) colony at f. p. jhirka in nuh district.

Read more
Construction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)

Construction of road by interlocking tiles in vill. adarsh tehri, pathri part-2 and basti no. 3 and 4 main road to towards bishan singh panwar house in constituency haridwar gradistt. haridwar under state sector (job 2)

Read more
Day to day maintenance of misc electrical services through service cell in residential and tech area at dibt mysore under ge i r and d east bangalore

Day to day maintenance of misc electrical services through service cell in residential and tech area at dibt mysore under ge i r and d east bangalore

Read more
In the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.

In the jurisdiction of electricity distribution division-dibai, work of shifting 11 kv and lt electric poles which are obstructing the road widening from govindpur gate to atrauli railway station.

Read more
A/r and m/o various roads under pwd division south west road-2/sub division-1,2,3,4 and 5 during 2026-27. (sh- emergency response arrangement for water logging through deployment of additional maintenance van and 127 hp pump during monsoon season).

A/r and m/o various roads under pwd division south west road-2/sub division-1,2,3,4 and 5 during 2026-27. (sh- emergency response arrangement for water logging through deployment of additional maintenance van and 127 hp pump during monsoon season).

Read more
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp

Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise