Tender Details

Particulars Details
Title
Construction Of Bridge Over Chimbel Creek At Km 150.600 In A Length Of 200 Mts And Approaches In 100 Mts Length Along Ribander Bypass On Nh 748 In The State Of Goa. Reg Hiring Of Tourist Vehicle For, Divisional Office, Wdvii(nh),Pwd, Panaji Goa.
Description
Construction Of Bridge Over Chimbel Creek At Km 150.600 In A Length Of 200 Mts And Approaches In 100 Mts Length Along Ribander Bypass On Nh 748 In The State Of Goa. Reg Hiring Of Tourist Vehicle For, Divisional Office, Wdvii(nh),Pwd, Panaji Goa.
Organisation Government of Goa
Tender Id 2023_PWD_10098_1
Reference
Number
2023-24/PWD/WDVII(NH)/ASW/09/2
Tender Fee 3000
EMD 20700
Tender Value
Place EE WD VII, PWD
Link https://eprocure.goa.gov.in
Start Date July 20, 2023 22:30
End Date

11/08/2023 ( Expired 678 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Hiring of tourist taxi such as innova or equivalent make on hire charges basis. (vehicle-1/1 for office of superintending engineer, co-ix(nh), pwd, altinho, panaji, goa ).

Hiring of tourist taxi such as innova or equivalent make on hire charges basis. (vehicle-1/1 for office of superintending engineer, co-ix(nh), pwd, altinho, panaji, goa ).

Read more
Maintenance of ribander bypass from km 143/200 to km 152/820 on nh-748 in the state of goa under performance based maintenance contract (pbmc) 2024-25

Maintenance of ribander bypass from km 143/200 to km 152/820 on nh-748 in the state of goa under performance based maintenance contract (pbmc) 2024-25

Read more
Construction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode

Construction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode

Read more
Construction of vehicular underpass (vup) including approaches near peddem junction at 502.327 of nh-66 in the state of goa on epc mode under road safety annual plan 2024-25 reg hiring of vehicle for a period of 24 months for use of ae iii colvale

Construction of vehicular underpass (vup) including approaches near peddem junction at 502.327 of nh-66 in the state of goa on epc mode under road safety annual plan 2024-25 reg hiring of vehicle for a period of 24 months for use of ae iii colvale

Read more
Construction of vehicular underpass (vup) including approaches near peddem junction at 502.327 of nh-66 in the state of goa on epc mode under road safety annual plan 2024-25. reg hiring of vehicle for a period of 24 months for use of ae ii mapusa

Construction of vehicular underpass (vup) including approaches near peddem junction at 502.327 of nh-66 in the state of goa on epc mode under road safety annual plan 2024-25. reg hiring of vehicle for a period of 24 months for use of ae ii mapusa

Read more
Construction on major bridge on bori river at ch.98.020 along with approaches from km 97.600 to km 98.350 total length of the project 0.750 km on akkalkot gangapur

Construction on major bridge on bori river at ch.98.020 along with approaches from km 97.600 to km 98.350 total length of the project 0.750 km on akkalkot gangapur&#x0d road of nh 150e on epc mode in the state of maharashtra&#x0d

Read more
Pwd-nh(br)/ran/sopd/2024-25/01 construction of new bridge over river mangoldoi (br.no 35/1) including approaches, service road and drain in place of the abandoned bailey bridge on nh-15 under sopd for the year 2024-25 under pwd rangia nh division in

Pwd-nh(br)/ran/sopd/2024-25/01 construction of new bridge over river mangoldoi (br.no 35/1) including approaches, service road and drain in place of the abandoned bailey bridge on nh-15 under sopd for the year 2024-25 under pwd rangia nh division in

Read more
Ie services for operation and maintenance of 6 lane extra dosed cable stayed sister nivedita bridge tollway project over river hooghly along with its approaches (on old nh-2) on bot toll basis in the state of west bengal

Ie services for operation and maintenance of 6 lane extra dosed cable stayed sister nivedita bridge tollway project over river hooghly along with its approaches (on old nh-2) on bot toll basis in the state of west bengal

Read more
Construction of approaches to zuari bridge on nh-66(package-iii) urgent stabilization of collapsed hillock by stepped benching along the service road of nh-66 between ch.532/300 to ch.532/600 at cortalim junction in the state of goa. (retender)

Construction of approaches to zuari bridge on nh-66(package-iii) urgent stabilization of collapsed hillock by stepped benching along the service road of nh-66 between ch.532/300 to ch.532/600 at cortalim junction in the state of goa. (retender)

Read more
Construction of approaches bridge across river zuari on nh-66 (package-iii) urgent stabilization of collapsed hillock by stepped benching along the service road of nh-66 between ch.532/300 to ch.532/600 at cortalim junction in the state of goa.

Construction of approaches bridge across river zuari on nh-66 (package-iii) urgent stabilization of collapsed hillock by stepped benching along the service road of nh-66 between ch.532/300 to ch.532/600 at cortalim junction in the state of goa.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise