Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Bridge Over Chimbel Creek At Km 150/600 In A Length Of 200 Mts And Approaches In 100 Mts Length Along Ribander Bypass On Nh 748 In The State Of Goa. Reg.Hiring Of Innova Vehicle For A Period Of 24 Months For Use Of Chief Engineer
|
Description |
Construction Of Bridge Over Chimbel Creek At Km 150/600 In A Length Of 200 Mts And Approaches In 100 Mts Length Along Ribander Bypass On Nh 748 In The State Of Goa. Reg. Hiring Of Innova Vehicle For A Period Of 24 Months For Use Of Chief Engineer
|
Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
Tender Id | 2024_PWD_15745_1 |
Reference Number |
2024-25/PWD/WDVII(NH)/ASW/02 |
Tender Fee | 6480 |
EMD | 34800 |
Tender Value | |
Place | At panaji |
Link | https://eprocure.goa.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=16023 |
Start Date | June 07, 2024 22:40 |
End Date |
14/06/2024 ( Expired 312 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode
Construction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode
Read moreConstruction of vehicular underpass (vup) including approaches near peddem junction at 502.327 of nh-66 in the state of goa on epc mode under road safety annual plan 2024-25 reg hiring of vehicle for a period of 24 months for use of ae iii colvale
Construction of vehicular underpass (vup) including approaches near peddem junction at 502.327 of nh-66 in the state of goa on epc mode under road safety annual plan 2024-25 reg hiring of vehicle for a period of 24 months for use of ae iii colvale
Read moreConstruction of vehicular underpass (vup) including approaches near peddem junction at 502.327 of nh-66 in the state of goa on epc mode under road safety annual plan 2024-25. reg hiring of vehicle for a period of 24 months for use of ae ii mapusa
Construction of vehicular underpass (vup) including approaches near peddem junction at 502.327 of nh-66 in the state of goa on epc mode under road safety annual plan 2024-25. reg hiring of vehicle for a period of 24 months for use of ae ii mapusa
Read moreRepair of existing road yermala at ch 205 plus 300 to 26 plus 500 total length 1200 mtr and minor bridge approaches near pathari village at ch 212 plus 200 to 212 plus 600 total length 400 mtr on nh 548 c road district dharashiv
Repair of existing road yermala at ch 205 plus 300 to 26 plus 500 total length 1200 mtr and minor bridge approaches near pathari village at ch 212 plus 200 to 212 plus 600 total length 400 mtr on nh 548 c road district dharashiv
Read moreConstruction on major bridge on bori river at ch.98.020 along with approaches from km 97.600 to km 98.350 total length of the project 0.750 km on akkalkot gangapur
Construction on major bridge on bori river at ch.98.020 along with approaches from km 97.600 to km 98.350 total length of the project 0.750 km on akkalkot gangapur
 road of nh 150e on epc mode in the state of maharashtra
Read moreIe services for operation and maintenance of 6 lane extra dosed cable stayed sister nivedita bridge tollway project over river hooghly along with its approaches (on old nh-2) on bot toll basis in the state of west bengal
Ie services for operation and maintenance of 6 lane extra dosed cable stayed sister nivedita bridge tollway project over river hooghly along with its approaches (on old nh-2) on bot toll basis in the state of west bengal
Read moreConstruction of approaches to zuari bridge on nh-66(package-iii) urgent stabilization of collapsed hillock by stepped benching along the service road of nh-66 between ch.532/300 to ch.532/600 at cortalim junction in the state of goa. (retender)
Construction of approaches to zuari bridge on nh-66(package-iii) urgent stabilization of collapsed hillock by stepped benching along the service road of nh-66 between ch.532/300 to ch.532/600 at cortalim junction in the state of goa. (retender)
Read moreConstruction of approaches bridge across river zuari on nh-66 (package-iii) urgent stabilization of collapsed hillock by stepped benching along the service road of nh-66 between ch.532/300 to ch.532/600 at cortalim junction in the state of goa.
Construction of approaches bridge across river zuari on nh-66 (package-iii) urgent stabilization of collapsed hillock by stepped benching along the service road of nh-66 between ch.532/300 to ch.532/600 at cortalim junction in the state of goa.
Read moreDibrugarh/crif/2023-24/02 construction of rcc bridge over river buridehing at romaighat including approaches and protection work in lahowal lac (bridge length 360m (6x60m)
Dibrugarh/crif/2023-24/02 construction of rcc bridge over river buridehing at romaighat including approaches and protection work in lahowal lac (bridge length 360m (6x60m)
Read moreDibrugarh/crif/2023-24/03 construction of rcc bridge over river dissang at baruanagar to mahmora including approaches and protection work in tingkhong lac. bridge length 120m (4x30m)
Dibrugarh/crif/2023-24/03 construction of rcc bridge over river dissang at baruanagar to mahmora including approaches and protection work in tingkhong lac. bridge length 120m (4x30m)
Read moreof your Industry type