Balance Work Of Track Laying And Linking, Ion Of Sej, Turnouts, Glued Joints, Running Of Ballast, Dismantling Of Track, Providing Lifting Barrier By L Xing, Transportation Of P. Way Materials Etc. Between Chikni Road (Km: 820.070) Warora (Km: 830.320) Total 10.250 Km In Wardha(sewagram) Ballarshah 3rd Line Project.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 76651709 |
Reference Number |
DYCECWR-10-2024 |
Tender Fee | 0 |
EMD | 3.94 Lakh |
Tender Value | |
Place | Mumbai CST |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/102024/76651709/viewNitPdf_4668703.pdf |
Start Date | September 28, 2024 21:53 |
End Date |
15/10/2024 ( Expired 210 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Re-fabrication of glued joints (in situ) against the work- maintenance of bg track, overhauling of lc gates, destressing of track, unloading of ballast on newly constructed bg track along with all other ancillary works between km:251/4 to 392/2 km (nbq-agt) of newly constructed bg double line in nbq-rny-kyq project.(balance work).
For complete deion and other details, please refer to tender
Read moreEarthwork in cutting/formation , extension of minor bridges, supply of stone ballast of 65 mm size(hard stone), transportation of p. way material, laying & linking of bg track including point- xing, dismantling of civil structures and other miscellaneous works in c/w converting stabling line no. 9 into running line and a passenger pf line at udaipur station
For complete deion and other details, please refer to tender
Read moreT.no.ju/const.-i/t-07/2024-25/ln-smr-bldi doubling/ linking - laying and linking of broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of p-way materials and other ancillary works between luni-samdari stations from km.656.510 to 705.050 and samdari-bishangarh stations from km.0.00 to 49.00 in connection with luni-samdari-bhildi doubling project.
For complete deion and other details, please refer to tender
Read moreVijayawada division: sw-i: trr(p) of exg. 60kg/90uts rails on psc6 sleepers 1660 density with new 60kg/r260 rails (lwr) for a total length of 4.20 km between gdr - bza & ki-bza sections. sw-ii: (i) tfr(a/f): through renewal of fittings on psc sleeper track from km 429.600- 431.400 on dn line for a total length of 1.800 km between bza-vskp section, (ii): gj:- through renewal of glued joints for a total of 43 nos. (60kg) at various locations between ki -bza section, (iii): ttr (rails)
For complete deion and other details, please refer to tender
Read moreEarthwork in cutting/formation , extension of minor bridges, supply of stone ballast of 65 mm size(hard stone), transportation of p. way material, laying & linking of bg track including point- xing, dismantling of civil structures and other miscellaneous works in c/w converting stabling line no. 9 into running line and a passenger pf line at udaipur station
For complete deion and other details, please refer to tender
Read moreDoubling of track between trivandrum and kanniyakumari. proposed manual linking of track, collection of ballast, ion of ballast, transportation of p.way materials, earthwork in filling for subgrade ,blanketing of formation, regrading of existing track and modification of level crossings etc. in trivandrum central (incl) yard to nemam yard (incl) from km 220615-229325, neyattinkara yard (incl) from km 232800 to 238300
For complete deion and other details, please refer to tender
Read moreDoubling of track between thiruvanathapuram and kanniyakumari - proposed manual linking of track, supply and collection of ballast, transportation, leading & ion of ballast, transportation of p.way materials, di and regrading of existing track etc. in erl yard from km 271200 to 273500.
For complete deion and other details, please refer to tender
Read moreBalance work of track laying and linking, ion of sej, turnouts, glued joints, running of ballast, dismantling of track, providing lifting barrier by l-xing, transportation of p. way materials etc. between chikni road (km: 820.070) - warora (km: 830.320) total 10.250 km in wardha(sewagram) - ballarshah 3rd line project.
For complete deion and other details, please refer to tender
Read moreExecution of earthwork in formation by filling and cutting, blanketing, construction of minor bridges, side drain, central drain, catch water drain, protection work, p. way track linking work with ballast supply, construction of staff quarter, road work, platform work, circulating area, structural steel work for fob, metalizing work, transportation of p. way materials including other related works for the 4th line railway track between bagdehi at km: 493.373 (including yard) to dhutra (up to l
For complete deion and other details, please refer to tender
Read moreLinking of bg track on psc sleepers including assembling/laying of points and crossing, linking at level crossing and bridges, dismantling of bg track wherever required, unloading and spreading of ballast, unloading/ collection all p. way materials from different places to site, carting and stacking of released materials, carting of psc sleepers, ballast and rails etc. for remodeling of gonda yard (final phase) and other misc. work in connection with 3rd line between gd-buw of lucknow divi
For complete deion and other details, please refer to tender