Tender Details

Particulars Details
Title
Strengthening And Improvement And Routine Maintenance Of 4 Lane Islampur Bypass Of 10.31 Km Length From Km 0.000 To Km 10.310 On Nh 27 Old Nh 31 In The State Of West Bengal On O And M Basis
Description
Strengthening And Improvement And Routine Maintenance Of 4 Lane Islampur Bypass Of 10.31 Km Length From Km 0.000 To Km 10.310 On Nh 27 Old Nh 31 In The State Of West Bengal On O And M Basis
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2025_NHAI_242073_1
Reference
Number
09/2025-26/NH-27/O_M/Islampur Bypass
Tender Fee 50000
EMD 35.1 Lakh
Tender Value -
Place Islampur Bypass
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=276139

Start Date July 22, 2025 14:40
End Date
Expired 15/09/2025

Expired 397 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode

Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.

Read more
Construction of 4 lane bypass road to the existing nh 31 and nh 922 through bairiya ara section from km. 0.000 to km. 27.062 in the state of uttar pradesh and bihar on epc mode

Construction of 4 lane bypass road to the existing nh 31 and nh 922 through bairiya ara section from km. 0.000 to km. 27.062 in the state of uttar pradesh and bihar on epc mode

Read more
One time improvement of 2 nos of bypasses of palma gumla section of old nh 23 new nh 43 i.e. bero bypass length 3.500 km and sisai bypass length 8.000 km total length 11.50 km in the state of jharkhand on item rate percentage basis.

One time improvement of 2 nos of bypasses of palma gumla section of old nh 23 new nh 43 i.e. bero bypass length 3.500 km and sisai bypass length 8.000 km total length 11.50 km in the state of jharkhand on item rate percentage basis.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham

Read more
Routine maintenance including incident management for nellore bypass section of nh-16 and badvel to chunchuluru section of nh-67 on stmc basis in the state of andhra pradesh

Routine maintenance including incident management for nellore bypass section of nh-16 and badvel to chunchuluru section of nh-67 on stmc basis in the state of andhra pradesh

Read more
Construction of 4 lane thiruvananthapuram outer ring road (orr) from navaikulam (ch. 0.000) to vizhinjam (ch. 62.700) section of nh 866 design length 62.7 km in kerala on bot mode

Construction of 4 lane thiruvananthapuram outer ring road (orr) from navaikulam (ch. 0.000) to vizhinjam (ch. 62.700) section of nh 866 design length 62.7 km in kerala on bot mode

Read more
Strengthening overlaying of four laning of barhi hazaribagh section of nh 20 from km 0.000 to km 41.279 (length 41.28 km in the state of jharkhand on item rate percentage basis

Strengthening overlaying of four laning of barhi hazaribagh section of nh 20 from km 0.000 to km 41.279 (length 41.28 km in the state of jharkhand on item rate percentage basis

Read more
Ie services for 4laning of jagtial-karimnagar section of nh-563 from jagtial bypass start at design ch.0.000 (ex.chainage 90-500 on nh-63) to design ch.58.866 km (ch.170.400 km) at karimnagar bypass end (58.866 km) to be executed on bot mode nh o

Ie services for 4laning of jagtial-karimnagar section of nh-563 from jagtial bypass start at design ch.0.000 (ex.chainage 90-500 on nh-63) to design ch.58.866 km (ch.170.400 km) at karimnagar bypass end (58.866 km) to be executed on bot mode nh o

Read more
Construction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.

Construction of 4 lane mukundra bypass on kota-jhalawar section of nh-52 in the state of rajasthan on epc mode.

Read more
Development of 4/6 lane green field bypass for etmadpur and tundla town on section of agra etawah nh 19 from design km. 0.000 to km. 16.200 in the state of uttar pradesh on epc mode.

Development of 4/6 lane green field bypass for etmadpur and tundla town on section of agra etawah nh 19 from design km. 0.000 to km. 16.200 in the state of uttar pradesh on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise