Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Maintenance/ Strengthening Of Approach Road From Nh 08 Towards Railway Crossing Via Jnv Kherengjuri North Tripura
|
| Description |
Gsb Wbm Pmc Etc (L 0.290 Km)
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2025_CEPWD_59783_1 |
|
Reference Number |
98/EE/DD/PWD(RnB)/2024-25 |
| Tender Fee | 1000 |
| EMD | 45580 |
| Tender Value | - |
| Place | Kadamtala |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=60810 |
| Start Date | March 26, 2025 14:30 |
| End Date |
Expired
16/04/2025
Expired 549 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening of badera approach road length 1.20 and niwar railway station approach road length 0.50 km
Strengthening of badera approach road length 1.20 and niwar railway station approach road length 0.50 km
Read moreConstruction of road over bridge (full rob) in lieu of level crossing no. am -34 at km -323/14-15 between jamadoba -bhaga station under adra division, road over bridge (only approach portion) in lieu of level crossing no. 239 at rly. km. 149/29-31 between railway station tangarmunda-dharuadihi at bamra railway station yard under chakradharpur division , road over bridge (only approach portion) in lieu of level crossing no. 256 at rly. km. 510/12-14 between railway station dhutra-jharsuguda in
Construction of road over bridge (full rob) in lieu of level crossing no. am -34 at km -323/14-15 between jamadoba -bhaga station under adra division, road over bridge (only approach portion) in lieu of level crossing no. 239 at rly. km. 149/29-31 between railway station tangarmunda-dharuadihi at bamra railway station yard under chakradharpur division , road over bridge (only approach portion) in lieu of level crossing no. 256 at rly. km. 510/12-14 between railway station dhutra-jharsuguda in
Read moreConstruction of rob in lieu of level crossing no. 229 at km 1324/16-18 in between rpgu-bnar stations in vglj-cnb section & construction of rob in lieu of level crossing no. 367 at km 1126/20-22 at jhansi yard in bina-vglj section in jhansi division of north central railway.
Construction of rob in lieu of level crossing no. 229 at km 1324/16-18 in between rpgu-bnar stations in vglj-cnb section & construction of rob in lieu of level crossing no. 367 at km 1126/20-22 at jhansi yard in bina-vglj section in jhansi division of north central railway.
Read moreConstruction of cement concrete road of 2 lane with paved shoulder configuration from km. 168.180 shitala mata mandir to km 168.920 railway crossing total length - 740 m on bhandara-khat-ghotitok road nh-247 in the state of maharashtra
Construction of cement concrete road of 2 lane with paved shoulder configuration from km. 168.180 shitala mata mandir to km 168.920 railway crossing total length - 740 m on bhandara-khat-ghotitok road nh-247 in the state of maharashtra
Read moreConstruction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreConstruction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway
Construction of 2-lane end-to-end robs with reinforced earth wall (re wall) approaches, psc girder viaducts and rdso s camel back truss girder over the railway portion including lhs in lieu of level crossing nos. 245/b1 [km 630/9-10 between mankapur-jhilahi] and 318 spl [km 742/3-4 between jahangirabad-barabanki] in lucknow division of north eastern railway
Read moreManufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khaira
Manufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khairatabad zone (o and m division no.16).
Read moreManufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khaira
Manufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 600mm dia inline and rcc pipeline ms plate with 1000mm dia trenchless technology tunneling with pipe jacking method along with required specials at sanathnagar railway track for facilitating construction of rub at sanathnagar yard approach towards secunderabad at railway km 175/36-176/1 under (old.fathenagar section, sd-iii, o and m division no.vi) (reach-i) under sanath nagar ward, ameerpet circle, khairatabad zone (o and m division no.16).
Read moreConstruction of 01(one) lac litre capacity water storage tank at jnv kherengjuri, north tripura under pwd (rnb) kadamtala sub-division
Rcc water tank including pump house pumping arrangment and other allied works etc during the year 2025-26.
Read moreof your Industry type