Tender Details
Particulars | Details |
---|---|
Title |
Design And Construction Of Bow String Steel Girder Railway Bridge Portion At Lc No 108 A On Barabanki Akbarpur Railway Route In Distt Ayodhya Including Work Of Foundation And Sub Structure Of Rly Portion On Epc Mode
|
Description |
Design And Construction Of Bow String Steel Girder Railway Bridge Portion At Lc No 108 A On Barabanki Akbarpur Railway Route In Distt Ayodhya Including Work Of Foundation And Sub Structure Of Rly Portion On Epc Mode
|
Organisation | UP STATE BRIDGE CORPORATION LIMITED | State Govt. and UT |
Tender Id | 2024_UPSBC_884404_1 |
Reference Number |
1544/E-TENDER/CPM AYODHYA/2023-24 DT 23.01.2024 |
Tender Fee | 23600 |
EMD | 15 Lakh |
Tender Value | |
Place | AYODHYA |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1513888 |
Start Date | January 23, 2024 23:30 |
End Date |
13/02/2024 ( Expired 467 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(3rd call)
Sub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(3rd call)
Read moreConstruction of 02 lane rail over bridge at level crossing no 300-spl chowka ghat budhwal block section km713 16 18 on gonda lucknow n.e. railway rail section in distt barabanki on epc mode
Construction of 02 lane rail over bridge at level crossing no 300-spl chowka ghat budhwal block section km713 16 18 on gonda lucknow n.e. railway rail section in distt barabanki on epc mode
Read moreDesign and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode
Design and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreConstruction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode
Construction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode
Read moreDesign and construction of 1x30 mtr steel girder bridge over astan nallah at dawar gurez on main road on epc mode (engineering procurement and construction mode)
Design and construction of 1x30 mtr steel girder bridge over astan nallah at dawar gurez on main road on epc mode (engineering procurement and construction mode)
Read moreDesign and construction of 1x40 mtr span steel trussed bridge at angaikote tulail gurez on epc mode (engineering procurement and construction mode)
Design and construction of 1x40 mtr span steel trussed bridge at angaikote tulail gurez on epc mode (engineering procurement and construction mode)
Read moreProject management consultancy services for proof checking, construction supervision, quality assurance, quality control quality audit for the work of construction of 4 lane composite steel girder bridge on the pipeline road across fox sagar surplus nala under engineering procurement construction (epc)/turnkey basis.
Project management consultancy services for proof checking, construction supervision, quality assurance, quality control and quality audit for the work of construction of 4 lane composite steel girder bridge on the pipeline road across fox sagar surplus nala under engineering procurement construction (epc)/turnkey basis
Read moreConstruction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode
Read moreConst. of 2 lane rob with the bow string steel beam in lieu of lc no. 118-c/e-2 at km. 250/9-11 in between dukheri- kesri railway station on sre-umb section on dfcc route in ambala distt. (rd. km. 0.00 to 0.585). (pdg. solar street light).
Const. of 2 lane rob with the bow string steel beam in lieu of lc no. 118-c/e-2 at km. 250/9-11 in between dukheri- kesri railway station on sre-umb section on dfcc route in ambala distt. (rd. km. 0.00 to 0.585). (pdg. solar street light).
Read moreof your Industry type