Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Re Supporting Of Roof By Roof Bolts With Resin Capsule Along Travelling Roadway,Belt Roadway And Near Pumping Station Drilling Of Holes, Jamming And Tightening The Roof With Bearing Plats/W Straps Including Carriage Of Materials From Nearest Distric
|
| Description |
Re Supporting Of Roof By Roof Bolts With Resin Capsule Along Travelling Roadway,Belt Roadway And Near Pumping Station Drilling Of Holes, Jamming And Tightening The Roof With Bearing Plats/W Straps Including Carriage Of Materials From Nearest Distric
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_SECL_299273_1 |
|
Reference Number |
AGM/HSD/GM(O)/e-Tend/23-24/173 dtd 24.01.2024 |
| Tender Fee | 0 |
| EMD | 62700 |
| Tender Value | - |
| Place | Hasdeo Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=309995 |
| Start Date | January 24, 2024 23:30 |
| End Date |
Expired
13/02/2024
Expired 977 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supporting of roof by manual drilling of holes, jamming and tightening the roof with bearing plates/w-straps for strengthening the roof and sides bolts along travelling roadways, conveyor roadways and haulage roadways between ol to 15l of 4a seam at
Supporting of roof by manual drilling of holes, jamming and tightening the roof with bearing plates/w-straps for strengthening the roof and sides bolts along travelling roadways, conveyor roadways and haulage roadways between ol to 15l of 4a seam at
Read more(1) supporting of roof by mechanical drilling of holes (1.5m length, 29mm dia) , jamming with resin capsule , tightening the roof bolts with bearing plates / w- straps at practical practice route (2) white washing work along practical practice rou
(1) supporting of roof by mechanical drilling of holes (1.5m length, 29mm dia) , jamming with resin capsule , tightening the roof bolts with bearing plates / w- straps at practical practice route (2) white washing work along practical practice rou
Read more(i) re-supporting of roof by roof bolts with resin capsule (ii) side dressing (iii) cleaning and removal, etc. along travelling roadway, haulage roadway and belt roadway in seam b-bottom at kurja ug mine
(i) re-supporting of roof by roof bolts with resin capsule (ii) side dressing (iii) cleaning and removal, etc. along travelling roadway, haulage roadway and belt roadway in seam b-bottom at kurja ug mine
Read more(i) re-supporting of roof by roof bolts with resin capsule (ii) side dressing (iii) cleaning and removal, etc. along travelling roadway, haulage roadway and belt roadway in seam b-bottom at kurja ug mine.
(i) re-supporting of roof by roof bolts with resin capsule (ii) side dressing (iii) cleaning and removal, etc. along travelling roadway, haulage roadway and belt roadway in seam b-bottom at kurja ug mine.
Read moreSupporting of roof by mechanical drilling of holes (1.50m length, 29mm dia), jamming, tightening the roof bolts with bearing plates / w-straps including carriage of materials from nearest district store to working faces of p-22 panel of seam-iv b of
Supporting of roof by mechanical drilling of holes (1.50m length, 29mm dia), jamming, tightening the roof bolts with bearing plates / w-straps including carriage of materials from nearest district store to working faces of p-22 panel of seam-iv b of
Read moreRoof support by roof bolting along travelling roadway of incline of rvii seam of bankola colliery
Roof support by roof bolting along travelling roadway of incline of rvii seam of bankola colliery
Read moreRoof bolting at travelling roadway and haulage roadway for east section at parbelia colliery hijuli r-viii seam working
Roof bolting at travelling roadway and haulage roadway for east section at parbelia colliery hijuli r-viii seam working
Read moreSide / roof dressing and cleaning of fallen material along travelling roadway from 16r to 35r along -77ln old gallery for new travelling roadway for re- organization of belt and travelling roadway in 4a seam at jhiria ug mine.
Side / roof dressing and cleaning of fallen material along travelling roadway from 16r to 35r along -77ln old gallery for new travelling roadway for re- organization of belt and travelling roadway in 4a seam at jhiria ug mine.
Read moreRoof support by roof bolting along travelling roadway of no.2 incline of rvii seam of bankola colliery.
Roof support by roof bolting along travelling roadway of no.2 incline of rvii seam of bankola colliery.
Read moreRoof support by roof bolting along travelling roadway of sankalpa khani incline of rvii seam of bankola colliery.
Roof support by roof bolting along travelling roadway of sankalpa khani incline of rvii seam of bankola colliery.
Read moreof your Industry type