Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Installation And Energisation Of Bahalda Iv Lip Under Bahalda Block In Mayurbhanj District
|
| Description |
Installation And Energisation Of Bahalda Iv Lip Under Bahalda Block In Mayurbhanj District
|
| Organisation | Government of Odisha |
| Tender Id | 2023_OLIC_96854_1 |
|
Reference Number |
BID ID NO.20 EELID (KJA/2023-24) DATE. 01.11.2023 |
| Tender Fee | 6000 |
| EMD | 29085 |
| Tender Value | - |
| Place | EE, LI Division Karanjia |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in |
| Start Date | November 14, 2023 16:30 |
| End Date |
Expired
29/11/2023
Expired 1046 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of wing shrouds and lip shrouds for 11cum buckets for ex1900 hydraulic shovels at rgocp-iii rg-ii area.
Procurement of wing shrouds and lip shrouds for 11cum buckets for ex1900 hydraulic shovels at rgocp-iii rg-ii area.
Read moreDismantling of old chain link fencing and providing compound wall allround kpcl quarters at bhep colony- phase iv
Replacement of damaged chain-link fencing with construction of a compound wall with barbed wire on top along the boundary of bhadra colony for a balance length of 410m.
Read moreTggenco-ytps-supply of seal ring segments for hp1103 bowl mills required for boiler-iii and iv/ytps/stg-ii.
Tggenco-ytps-supply of seal ring segments for hp1103 bowl mills required for boiler-iii and iv/ytps/stg-ii.
Read moreRequest for proposal (rfp) for printing and supply of teaching learning material for fln-tarl for classes iv to viii at all 38 district headquarters of bihar.
Request for proposal (rfp) for printing and supply of teaching learning material for fln-tarl for classes iv to viii at all 38 district headquarters of bihar.
Read moreTggenco-ytps(5x800mw)-cam-iv-bop-supply of bdk make body diaphragms for diaphragm valves and body seats for butterfly valves in cpu regeneration area in dm plant
Tggenco-ytps(5x800mw)-cam-iv-bop-supply of bdk make body diaphragms for diaphragm valves and body seats for butterfly valves in cpu regeneration area in dm plant
Read morePart design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreTggenco btps stage ii bm division overhaul of aphs 2nos and aph gearboxes 2nos, replacement/ reversal of heating elements, seals and other miscellaneous works of air pre heaters in unit-iv during annual overhaul 2026-27
Tggenco btps stage ii bm division overhaul of aphs 2nos and aph gearboxes 2nos, replacement/ reversal of heating elements, seals and other miscellaneous works of air pre heaters in unit-iv during annual overhaul 2026-27
Read moreErection, testing and commissioning of switchyard for 7nos. 33/11 kv sub stations at i) mylaram (vg), (ii) sathapoor (vg), iii) marikal (vg), (iv) rachalapally (vg) v) jedipally (vg), vi) siddapur (vg), and vii) ramajipally (vg), of nagarkurnool circle
Erection, testing and commissioning of switchyard for 7nos. 33/11 kv sub stations at i) mylaram (vg), (ii) sathapoor (vg), iii) marikal (vg), (iv) rachalapally (vg) v) jedipally (vg), vi) siddapur (vg), and vii) ramajipally (vg), of nagarkurnool circle
Read moreTggenco btps stage-ii bm-division replacement, repair and rectification of mill discharge valve assembly, inspection / repair of orifices and replacement of coupling gaskets of coal pipes of xrp-943 bowl mills of unit -iv during overhaul for the year 2026-27
Tggenco btps stage-ii bm-division replacement, repair and rectification of mill discharge valve assembly, inspection / repair of orifices and replacement of coupling gaskets of coal pipes of xrp-943 bowl mills of unit -iv during overhaul for the year 2026-27
Read moreErection, testing and commissioning of switchyard for 09nos. 33/11 kv sub stations at i) narreguda(vg), (ii) appaipally(vg), iii) lingampally (regadimylvar) (vg), (iv) polkampally (vg), v) gudur (vg), vi) jaffarpally (vg), vii) pudur (vg), viii) hazipur (vg), and ix) mekavanampally (vg), of vikarabad circle
Erection, testing and commissioning of switchyard for 09nos. 33/11 kv sub stations at i) narreguda(vg), (ii) appaipally(vg), iii) lingampally (regadimylvar) (vg), (iv) polkampally (vg), v) gudur (vg), vi) jaffarpally (vg), vii) pudur (vg), viii) hazipur (vg), and ix) mekavanampally (vg), of vikarabad circle
Read moreof your Industry type