Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
W/S Of Nh 24 To Kutuwapur Canal Bridge Odr Km 3(550) 4, 5, 6 And 7 (770)
|
| Description |
W/S Of Nh 24 To Kutuwapur Canal Bridge Odr Km 3(550) 4, 5, 6 And 7 (770)
|
| Organisation | Chief Engineer PWD Central Zone,Lucknow | State Govt. and UT |
| Tender Id | 2024_CEUCZ_907628_1 |
|
Reference Number |
1193/352C/Etender/23-24 dt 19.02.2024 |
| Tender Fee | 2715 |
| EMD | 19.96 Lakh |
| Tender Value | |
| Place | Lakhimpur kheri |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1565391 |
| Start Date | February 29, 2024 17:30 |
| End Date |
Expired
05/03/2024
Expired 846 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read more7) construction of bt road gandher to chacha khedi km 2/0 to 3/00
7) construction of bt road gandher to chacha khedi km 2/0 to 3/00
Read moreCapacity augmentation by construction of pqc service roads and misc works at various locations of 6 lane motachiloda km 494.410 to nanachiloda km 509.550 of nh-48 in gujarat on single percentage item rate basis at risk and cost of existing contractor
Capacity augmentation by construction of pqc service roads and misc works at various locations of 6 lane motachiloda km 494.410 to nanachiloda km 509.550 of nh-48 in gujarat on single percentage item rate basis at risk and cost of existing contractor
Read moreWidening and strengthening of pilibhit basti marg (nh 730) km 150 to khamariya link road (bu agri logistic sylo)
Widening and strengthening of pilibhit basti marg (nh 730) km 150 to khamariya link road (bu agri logistic sylo)
Read moreS s pipe fittings for bogie piping of wag9hc/wap7 cat no.s/9/0052 spec - clw spec.no.clw/ms/3/053 alt.21
For complete deion and other details, please refer to tender
Read moreDesign, supply, installation, testing and commissioning of entire pipeline system from mph to s-4 and from s-4 pump house to connected branches sprinkling system and automation using of self dynamic hydro control val
Design, supply, installation, testing and commissioning of entire pipeline system from mph to s-4 and from s-4 pump house to connected branches 
 sprinkling system and automation using of self dynamic hydro control val
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreof your Industry type