Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
54(niq)/Ae Haldwani/50
|
Description |
Construction Of Hostel Building Block 1 G Plus 3 With 8 Nos Additional Rooms 2 Rooms At Each Floor Level For Trainees At Nsti Campus Haldwani Uk Sh Consultancy Services For Comprehensive Structural Design And Vetting For Substation Building
|
Organisation | Central Public Works Department (CPWD) | Central Govt. Ministry/Department |
Tender Id | 71427 |
Reference Number |
54(NIQ)/AE-Haldwani/50 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | |
Link | https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=637077642463707764243731343237243534284e4951292f41452d48616c6477616e692f3530 |
Start Date | March 12, 2024 17:16 |
End Date |
19/03/2024 ( Expired 476 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
AAAAAAAAAA
Login to viewConstruction of hostel building block one (g plus three) with 8 nos. additional rooms (two rooms at each floor level) for trainees at nsti campus haldwani (uk) and c/o boys hostel building block two (g plus 3) with eight nos. additional room for trainees at nsti campus haldwani (uk) (sh sitch of kitchen ventilation system at nsti campus haldwani
Read more40/ae(e)/kcesd-iii/kced-i/cpwd/2025-26
Moei fans including rmo motor pump sets i/c compound light for 42 nos. quarters, international hostel, guest house, institute building of aiih ph, second campus at salt lake, kolkata during 2025-26 (sh: servicing, overhauling of 1 no. 630 kva transformer, 1 no. 500 kva transformer, 02 nos. lt panels, dehydration and filtration of transformers, replacement of damaged led including lights, ammeter and voltmeters).
Read more08/nit/ee/mcd/cpwd/2025-26
Construction of additional floor on existing boys hostel (160 bedded capacity) under drpcau, pusa. sh : rendering the staff services on monthly basis in the office of executive engineer, cpwd at msme building, gaushala road, muzaffarpur for the period of 06 (six) months.
Read more14/ae-iv/try/2025-26
Repairs and mainteance works like replacing of floor tiles in kitchen,dining hall washing area of kitchen building,replacing of tiles in girls hostel (3 rooms) recreation hall,dismantling and replacing of galvaume shed and other miscellaneous works for sai traning centre at mayiladuthurai (sh: replacing of water tank in canteen and boys hostel, p/f of upvc and ms grills and other miscellaneous works)
Read moreEstimate no. 232007 of 2025.2026 providing fully comprehensive type amc of 10 passenger g plus 5 avinyatech elevators make lift total 8 nos. in the boys hostel 4 nos. and girls hostel 4 nos. in the dr. babasaheb ambedkar bhavan premises at yerwada pu
Estimate no. 232007 of 2025.2026 providing fully comprehensive type amc of 10 passenger g plus 5 avinyatech elevators make lift total 8 nos. in the boys hostel 4 nos. and girls hostel 4 nos. in the dr. babasaheb ambedkar bhavan premises at yerwada pu
Read more01//eesm(e)-1/ukp/2025-26
Design and construction of satellite centre comprising of earthquake resistant 280 bedded multispeciality hospital ground plus 5 floors sr hostel 40 suites g plus 5, 1 block nurse hostel 48 rooms g plus 3 1 block type 4 12 nos g plus 5 1 block sub station pump house mortuary mgps laundry stp and pump room shopping complex sarai and chiller plant building including all internal and external civil and eand m development works horticulture works and supply and installation of medical office and residential furniture for aiims rishikesh at udham singh nagar uttarakhand in epc mode sh: providing and running of inspection vehicle on hire basis for sub division-ii office of ee and sm(e)-1 uttarakhand projects cpwd rishikesh
Read more07/ce(bhopal)/ee-ii/2025-26
C/o teaching and research lab (g plus 4) for indian institute of science education and research (iiser) at bhopal (m.p.). on epc (mode-1). sh: planning, designing and construction of teaching and research lab (g plus 4) consisting of two no. central instrument facility (cif) hall (at g.f.), 24 nos. research lab (6 nos. each at 1st floor, 2nd floor, 3rd floor and 4th floor), 24 nos. research lab (6 nos. each at 1st floor, 2nd floor, 3rd floor and 4th floor), 24 nos. faculty room (6 nos. each at 1st floor, 2nd floor, 3rd floor, and 4 floor), 4 nos. academic lab (1 nos. each at 1st floor, 2nd floor, 3rd floor and 4th floor), ahu rooms, toilets with modular cubical and modular urinal partitions, other rooms (as per architectural drawings), accessible ramps, parking area, accessible road around the building and nearby development etc. including internal water supply, sanitary installation, drainage, all e and m services such as internal e/i ......... including development with bim models.
Read more10/ee/gd/2025-26
Construction of temporary class rooms hostel accommodation kitchen block toilet block and other miscellaneous work including electrical works for rashtriya vedavidya pratishthan under maharshi sandip,ani rashtriya vedavidya pratishthan at dakhingaon guwahati sh installation of 2 nos deep tube well construction of septic tank for 50 users construction ug sump and installation of 2 nos submersible pump sets sh additional civil works
Read more02-r1/nit/sepd/bgpc/2024-25
Construction of 04 four nos school building at central university of south bihar gaya on engineering procurement and construction (epc) basis sh : construction of school of law and governance g plus 2 with provision of additional one floor in future school of business stus and management g plus one with provision of additional two floor in future health science g plus one with provision of additional two floor in future school of physical and chemical science g plus two with provision of additional one floor in future including lift and intenal and external water supply sanitary installation drainage storm water drain road and paths parking internal electrical installations street lighting firefighting system fire alarm ups substation lan active and passive solar panel photovolatic cell etc on epc basis
Read moreConstruction of 02 (two) nos. quarters (one block-2 units-g plus 1 storied) for sub-divisional judicial magistrate and for civil judge (jr. div.) at teliamura, khowai district, tripura./ grade-iii/ sh- building portion including internal water supply
Construction of 02 (two) nos. quarters (one block-2 units-g plus 1 storied) for sub-divisional judicial magistrate and for civil judge (jr. div.) at teliamura, khowai district, tripura./ grade-iii/ sh- building portion including internal water supply
Read moreof your Industry type