Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Anti Erosion Work At Left Bank Of Gumani River In 100 M Length At Village Bada Chandpur From House Of Taimur To House Of Entaj Ali.
|
Description |
Anti Erosion Work At Left Bank Of Gumani River In 100 M Length At Village Bada Chandpur From House Of Taimur To House Of Entaj Ali.
|
Organisation | WRD EinC Major-Med n Minor | State Govt. and UT |
Tender Id | 2025_WRD_102118_1 |
Reference Number |
WRD/IRR.DIV. BARHARWA/ F2-01/2025-26 (Gr-02) |
Tender Fee | 10000 |
EMD | 1.65 Lakh |
Tender Value | |
Place | BARHARWA |
Link | https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=137207 |
Start Date | June 16, 2025 15:30 |
End Date |
25/06/2025 ( Expired 22 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as p
Rehabilitation and upgradation for kopargaon to savli vihir section from km. 354.000 to km.362.663 total length 8.663 of nh 752 g to 4l.ps in the state of maharashtra. repairs of bad patches and dis at the risk and cost of the contractor as p
Read moreConsultancy services for preparation of detailed project report for widening work from km. 142 to 156 including construction of bridge at km. 131 and km. 148 (umarda canal bridges and ishan river bridge ) of nh-234 (old nh-91a) in the state of u.p.
Consultancy services for preparation of detailed project report for widening work from km. 142 to 156 including construction of bridge at km. 131 and km. 148 (umarda canal bridges and ishan river bridge ) of nh-234 (old nh-91a) in the state of u.p.
Read moreConstruction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreConsultancy services for authority engineer for supervision of construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu through an engineering, procu
Consultancy services for authority engineer for supervision of construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu through an engineering, procu
Read moreConstruction work of cc road from pwd road in mohalla padav in ward no. 13 via kapil mishra house to mohammad hanif
Construction work of cc road from pwd road in mohalla padav in ward no. 13 via kapil mishra house to mohammad hanif
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreCarrying lifting of river bed material already extracted from power house 1 and stocked at stockyard of department near power house 1 of shahpurkandi dam project at village barkola and harur tehsil and district pathankot
Carrying lifting of river bed material already extracted from power house 1 and stocked at stockyard of department near power house 1 of shahpurkandi dam project at village barkola and harur tehsil and district pathankot
Read moreConstruction work of pcc road and rcc drain at patel colony in old nh 7 to lotan vishwkarma house ward no 15
Construction work of pcc road and rcc drain at patel colony in old nh 7 to lotan vishwkarma house ward no 15
Read moreWard no. 06 interlocking work from nirmal pandey house to somnath house (length-200 m)
Ward no. 06 interlocking work from nirmal pandey house to somnath house (length-200 m)
Read moreof your Industry type