Tender Details
Particulars | Details |
---|---|
Title |
Construction Of C.C. Road From Shridhar Mhatre Wadi To Gaondevi Mandir Navapada In Ward No. 59, Dombivli (W). (Mla Fund)
|
Description |
Construction Of C.C. Road From Shridhar Mhatre Wadi To Gaondevi Mandir Navapada In Ward No. 59, Dombivli (W). (Mla Fund)
|
Organisation | Government of Maharashtra |
Tender Id | 2023_KDMC_922896_1 |
Reference Number |
KDMC/PWD/2023-24/35-4 |
Tender Fee | 590 |
EMD | 21300 |
Tender Value | |
Place | e-Tender Cell, KDMC, Kalyan |
Link | https://mahatenders.gov.in |
Start Date | July 07, 2023 14:30 |
End Date |
21/07/2023 ( Expired 688 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConstruction of mipi-andrathang road from km 20.000 to 50.000
Construction of mipi-andrathang road from km 20.000 to 50.000
 (design length 34.880 km between km 20.000 to 54.880)green field
 alignment to nhsl specifications in the aor of 62 rcc under 752 brtf
 of project udayak in arunachal pradesh state
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreConstruction of cc road and drain from kk shrivastav factory to trinching groun at ward no 10 and 12 tikamgarh
Construction of cc road and drain from kk shrivastav factory to trinching groun at ward no 10 and 12 tikamgarh
Read moreConstruction of cc road in various gali in rani baag and shiv mandir nagar in ward n. 09 dewas
Construction of cc road in various gali in rani baag and shiv mandir nagar in ward n. 09 dewas
Read moreConstruction of c.c. road work at nagar parishad barghat different ward (ward no. 01, 03, 06, 08, 11, 13), barghat
Construction of c.c. road work at nagar parishad barghat different ward (ward no. 01, 03, 06, 08, 11, 13), barghat
Read moreConstruction of b.t. road work at bablu patel to aara mashin and mahamaya mandir to tekram masab ward no. 03, barghat
Construction of b.t. road work at bablu patel to aara mashin and mahamaya mandir to tekram masab ward no. 03, barghat
Read moreUnder the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.
Under the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.
Read moreConstruction of rain water harvesting system at different places in ward no. 01 to 45
Construction of rain water harvesting system at different places in ward no. 01 to 45
Read moreZone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Read moreof your Industry type