Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Execution Of Improvement And Capital Work In Reddiyarpatti And Perumalpuram Section In Urban Tirunelveli Division In Respect Of Tirunelveli Edc In Respect Of The Technical Specification In The Enquiry.
|
Description |
Execution Of Improvement And Capital Work In Reddiyarpatti And Perumalpuram Section In Urban Tirunelveli Division In Respect Of Tirunelveli Edc In Respect Of The Technical Specification In The Enquiry.&Amp#X0d
&Amp#X0d
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 2500 |
Tender Value | |
Place | Tirunelveli |
Link |
AAAAAAAAAA Login to view |
Start Date | June 30, 2025 23:30 |
End Date |
15/07/2025 ( 13 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh
Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh
Read moreConstruction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor
Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreEngineering, procurement and construction work of 04 lane railoverheadbridge, 04 lane flyover on gt road and 02 lane flyover on ghantaghar road in lieu of level crossing no. 02 special (nearjarib chowki) of kanpur-anwarganj-rawatpur railway section
Engineering, procurement and construction work of 04 lane railoverheadbridge, 04 lane flyover on gt road and 02 lane flyover on ghantaghar road in lieu of level crossing no. 02 special (nearjarib chowki) of kanpur-anwarganj-rawatpur railway section
Read moreFixing work of childrens swings, benches and dustbins inside the boundary wall of parks built in wards 01,03,11,26,32 and 36 under the municipal area. (as per attached specification)
Fixing work of childrens swings, benches and dustbins inside the boundary wall of parks built in wards 01,03,11,26,32 and 36 under the municipal area. (as per attached specification)
Read moreStrengthening and improvement of roads under world bank aided project tresp in damcherra block under kanchanpur division, pwd randb
Strengthening and improvement of roads under world bank aided project tresp in damcherra block under kanchanpur division, pwd randb
Read morePurchase and fixing work of gym equipment inside the boundary wall of parks constructed in wards 01,03,11,26,32 and 36 under the municipal area (as per attached specification)
Purchase and fixing work of gym equipment inside the boundary wall of parks constructed in wards 01,03,11,26,32 and 36 under the municipal area (as per attached specification)
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreDnit for modernization of various rural link roads falling in mc lalru and banur (earth work including construction of culverts drain etc) district sas nagar (special assistance to states for capital investment 2025-26 scheme) with 5 years maintena
Dnit for modernization of various rural link roads falling in mc lalru and banur (earth work including construction of culverts drain etc) district sas nagar (special assistance to states for capital investment 2025-26 scheme) with 5 years maintena
Read moreof your Industry type