Tender Details
Particulars | Details |
---|---|
Title |
Execution Of 3 Nos Improvement Work In V M Chatram And Perumalpuram Section Of Urban Tirunelveli Division In Respect Of Tirunelveli Edc In Respect Of The Technical Specification In The Enquiry
|
Description |
Execution Of 3 Nos Improvement Work In V M Chatram And Perumalpuram Section Of Urban Tirunelveli Division In Respect Of Tirunelveli Edc In Respect Of The Technical Specification In The Enquiry
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 2331 |
Tender Value | |
Place | Tirunelveli |
Link |
AAAAAAAAAA Login to view |
Start Date | May 14, 2025 21:30 |
End Date |
29/05/2025 ( 14 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Read moreStrengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana
Strengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana
Read moreConstruction of retaining wall and excavation work in the east and west direction of badhiya talab in kamla nagar ward 3. length 67.65 m, width 60 m
Construction of retaining wall and excavation work in the east and west direction of badhiya talab in kamla nagar ward 3. length 67.65 m, width 60 m
Read moreRfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Read moreConstruction work of cc from the house of himanshu soni to sandeep sahu, virendra soni to rani, ashok soni, rampal yadav and vinod kumar soni to the gate of mayur garden in mughalpura ward 08. (length 278 m and width 3 m)
Construction work of cc from the house of himanshu soni to sandeep sahu, virendra soni to rani, ashok soni, rampal yadav and vinod kumar soni to the gate of mayur garden in mughalpura ward 08. (length 278 m and width 3 m)&#x0d
Read moreConstruction work of c.c. road from waheeds house to sharif and siyaram rajputs house in ward 04, sikandarpura 02. (length 127 m and width 3 m)
Construction work of c.c. road from waheeds house to sharif and siyaram rajputs house in ward 04, sikandarpura 02. (length 127 m and width 3 m)&#x0d
Read moreConstruction of 5 nos. 200 mm x165mm x 300.00 m deep hydt well and providing 5 nos. 5 hp electric motor with submersible cable rope hdpe pipe and bore well chamber in wtp campus of keredari-peto rpwss under d.w. and s. division hazaribagh
Construction of 5 nos. 200 mm x165mm x 300.00 m deep hydt well and providing 5 nos. 5 hp electric motor with submersible cable rope hdpe pipe and bore well chamber in wtp campus of keredari-peto rpwss under d.w. and s. division hazaribagh
Read moreExecution of 3 nos improvement work in v m chatram and perumalpuram section of urban tirunelveli division in respect of tirunelveli edc in respect of the technical specification in the enquiry
Execution of 3 nos improvement work in v m chatram and perumalpuram section of urban tirunelveli division in respect of tirunelveli edc in respect of the technical specification in the enquiry
Read moreImprovement estimate for improving tail end voltage at krishnapuram dt by providing existing 7 2 11 conductor into 7 3 15 conductor and ing 2nos 8mtr psc poles under thuckalay section in thuckalay c and i section in thuckalay division
Improvement estimate for improving tail end voltage at krishnapuram dt by providing existing 7 2 11 conductor into 7 3 15 conductor and ing 2nos 8mtr psc poles under thuckalay section in thuckalay c and i section in thuckalay division
Read moreAnnual work contract for assistance in day to day work of testing division-ii of unit no. -3 and 4, 2x210mw, at sgtps, mppgcl, birsinghpur.
Annual work contract for assistance in day to day work of testing division-ii of unit no. -3 and 4, 2x210mw, at sgtps, mppgcl, birsinghpur.
Read moreof your Industry type