Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Annual Maintenance Of Horticulture Works In Inside Plant Area Part B
|
| Description |
Annual Maintenance Of Horticulture Works In Inside Plant Area Part B Old Gm Complex Area And Chp Area For 2025 26 (For 1 Year).
|
| Organisation | NTPC Limited | Public Sector Undertakings |
| Tender Id | 2025_NTPC_100525_1 |
|
Reference Number |
NTPC/Kahalgaon STPS/9900309037 |
| Tender Fee | 0 |
| EMD | 50000 |
| Tender Value | - |
| Place | Kahalgaon Super Thermal Power P.O. KAHALGAON STP K |
| Link |
View Original Tender Notice
https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=103738 |
| Start Date | September 24, 2025 15:30 |
| End Date |
Expired
09/10/2025
Expired 351 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Bt on r/f velthurlapally x road to gurrampet via, kondapur in ghanpur(mulugu)(m) of jayashankar bhupalpally district. (balance work part -b) estimate cost rs.3500.00 lakhs (grant:crr) (3rd call)
Bt on r/f velthurlapally x road to gurrampet via, kondapur in ghanpur(mulugu)(m) of jayashankar bhupalpally district. (balance work part -b) estimate cost rs.3500.00 lakhs (grant:crr) (3rd call)
Read moreHiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreAnnual maintenance contract of horticulture works in inside plant area
Annual maintenance contract of horticulture works in inside plant areapart b old gm complex area and chp area
Read moreAnnual maintenance contract of horticulture works inside plant area
Annual maintenance contract of horticulture works inside plant area main plant area part a 2024-2025 for 1 year duratio
Read moreAnnual maintenance contract of horticulture works inside plant area
Annual maintenance contract of horticulture works inside plant area (main plant area part-a) 2025-2026 for 1 year
Read moreBiennial horticulture development and maintenance works inside plant area
Biennial horticulture development and maintenance works inside plant area at bgtps
Read moreHorticulture maintenance in plant area part a
Horticulture maintenance in plant area part a
Read moreAnnual horticulture maintenance contract inside plant and amp its associated
Annual horticulture maintenance contract inside plant and amp its associatedareas at ntpc gadarwara
Read moreGrass cutting works inside plant area (part-c)
Grass cutting works inside plant area (part-c)
Read moreof your Industry type