Tender Details

Particulars Details
Title
Annual Maintenance Of Horticulture Works In Inside Plant Area Part B
Description
Annual Maintenance Of Horticulture Works In Inside Plant Area Part B Old Gm Complex Area And Chp Area For 2025 26 (For 1 Year).
Organisation NTPC Limited | Public Sector Undertakings
Tender Id 2025_NTPC_100525_1
Reference
Number
NTPC/Kahalgaon STPS/9900309037
Tender Fee 0
EMD 50000
Tender Value -
Place Kahalgaon Super Thermal Power P.O. KAHALGAON STP K
Link
View Original Tender Notice

https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=103738

Start Date September 24, 2025 15:30
End Date
Expired 09/10/2025

Expired 351 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Bt on r/f velthurlapally x road to gurrampet via, kondapur in ghanpur(mulugu)(m) of jayashankar bhupalpally district. (balance work part -b) estimate cost rs.3500.00 lakhs (grant:crr) (3rd call)

Bt on r/f velthurlapally x road to gurrampet via, kondapur in ghanpur(mulugu)(m) of jayashankar bhupalpally district. (balance work part -b) estimate cost rs.3500.00 lakhs (grant:crr) (3rd call)

Read more
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.

Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Annual maintenance contract of horticulture works in inside plant area

Annual maintenance contract of horticulture works in inside plant areapart b old gm complex area and chp area

Read more
Annual maintenance contract of horticulture works inside plant area

Annual maintenance contract of horticulture works inside plant area main plant area part a 2024-2025 for 1 year duratio

Read more
Annual maintenance contract of horticulture works inside plant area

Annual maintenance contract of horticulture works inside plant area (main plant area part-a) 2025-2026 for 1 year

Read more
Biennial horticulture development and maintenance works inside plant area

Biennial horticulture development and maintenance works inside plant area at bgtps

Read more
Horticulture maintenance in plant area part a

Horticulture maintenance in plant area part a

Read more
Annual horticulture maintenance contract inside plant and amp its associated

Annual horticulture maintenance contract inside plant and amp its associatedareas at ntpc gadarwara

Read more
Grass cutting works inside plant area (part-c)

Grass cutting works inside plant area (part-c)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise