Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ttps Operation Circle Mpm Ii Unit Iv Overhauling And Load Testing Of 2 Nos 10 Ton And 7.5 Ton Capacity Defective Crane At Unit Iv Mill Floor
|
| Description |
Ttps Operation Circle Mpm Ii Unit Iv Overhauling And Load Testing Of 2 Nos 10 Ton And 7.5 Ton Capacity Defective Crane At Unit Iv Mill Floor
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_472266_1 |
|
Reference Number |
CE/SE/O/TTPS/Spec.No.215/24-25 |
| Tender Fee | 0 |
| EMD | 3800 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=561095 |
| Start Date | August 12, 2024 22:00 |
| End Date |
Expired
27/08/2024
Expired 779 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps operation circle mpm ii unit v load testing of 7.5 ton capacity eot crane 2 nos and 10 ton capacity eot crane 2 nos during the year 2026 2027
Ttps operation circle mpm ii unit v load testing of 7.5 ton capacity eot crane 2 nos and 10 ton capacity eot crane 2 nos during the year 2026 2027
Read moreTtps operation circle mpm ii reconditioning of retrieved journal spring assembly from unit iv of hp 803 bowl mills
Ttps operation circle mpm ii reconditioning of retrieved journal spring assembly from unit iv of hp 803 bowl mills
Read moreTtps operation circle cad cwph ii load testing of 3 ton capacity electrical hoist in chlorination plant, 10 ton gantry crane machine no g 019, 25/5 ton eot crane machine no e 051 at cooling water pump house ii and 5 ton capacity electrical hoist in
Ttps operation circle cad cwph ii load testing of 3 ton capacity electrical hoist in chlorination plant, 10 ton gantry crane machine no g 019, 25/5 ton eot crane machine no e 051 at cooling water pump house ii and 5 ton capacity electrical hoist in
Read moreTtps operation circle mpm i unit iii machining or reconditioning of r.c feeder spares
Ttps operation circle mpm i unit iii machining or reconditioning of r.c feeder spares
Read moreMtps i m i circle ca rws fwph overhauling of 2 nos of 7.5 ton and 1no of 5 ton capacity crane available at fire water pump house area and load testing of all the cranes etc
Mtps i m i circle ca rws fwph overhauling of 2 nos of 7.5 ton and 1no of 5 ton capacity crane available at fire water pump house area and load testing of all the cranes etc
Read moreTtps operation circle mpm i unit iii attending to repair works in bunkers and overhauling of feeders 3a to 3f during forthcoming overhaul
Ttps operation circle mpm i unit iii attending to repair works in bunkers and overhauling of feeders 3a to 3f during forthcoming overhaul
Read moreTtps operation circle mpm i unit iii emptying of coal from rc bunkers 3a to 3f clearing collecting, loading, transporting and dumping the coal at coal yard ttps during the forthcoming overhaul
Ttps operation circle mpm i unit iii emptying of coal from rc bunkers 3a to 3f clearing collecting, loading, transporting and dumping the coal at coal yard ttps during the forthcoming overhaul
Read moreTtps es circle mrt ii annual overhauling works in unit iv for the year 2026 2027 for fsss system subdivision 3 mrt ii ttps
Ttps es circle mrt ii annual overhauling works in unit iv for the year 2026 2027 for fsss system subdivision 3 mrt ii ttps
Read moreTtps es circle mrt ii annual overhauling works in unit iv for the year 2026 2027 for ba sbc section subdivision iii mrt ii ttps
Ttps es circle mrt ii annual overhauling works in unit iv for the year 2026 2027 for ba sbc section subdivision iii mrt ii ttps
Read moreTtps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills d, e and f and boiler during the forthcoming overhaul
Ttps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills d, e and f and boiler during the forthcoming overhaul
Read moreof your Industry type