Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Right Side Cc Guard Wall In Between Rd 1400m To 1500m And Left Side In Between Rd 1580m To 1620m Of Godbhaga Distributary For The Year 2025 26
|
Description |
Construction Of Right Side Cc Guard Wall In Between Rd 1400m To 1500m And Left Side In Between Rd 1580m To 1620m Of Godbhaga Distributary For The Year 2025 26
|
Organisation | CE-BM,UM Basin,Burla | State Govt. and UT |
Tender Id | 2025_CEBBU_112885_1 |
Reference Number |
BID-01(9 OF 44)/25-26 |
Tender Fee | 4000 |
EMD | 9491 |
Tender Value | |
Place | BURLA |
Link | https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=537854 |
Start Date | May 01, 2025 16:30 |
End Date |
08/05/2025 ( Expired 33 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreAAAAAAAAAA
Login to viewRfp for consultancy services for preparation of dpr and providing pre-construction services in respect to up gradation of existing 2l to 4l plus ps agartala to udaipur section of nh-08 and udaipur to amarpur
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreOne time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25
One time improvements of bypassed stretches of the towns macherla from km 173.934 to km 177.924 rentachintala from km .190.485 to km .194.578 and gurazala from km 198.554 to km 204.170 of nh-167ad in the state of andhra pradesh for the year 2024-25
Read morePerformance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Performance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Read moreAAAAAAAAAA
Login to viewConsultancy services for preparation of feasibility study and detailed project report for construction of 4-lane with paved shoulder from phulbari to shillong in the state of meghalaya
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreAAAAAAAAAA
Login to viewConstruction of 1 no. rcc framed structure five storied building after demolition of existing residential five storied dilapidated condemned kmda building(block no. 02) to rehabilitate 65 nos present dwelling families and thorough restoration and str
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreCleaning of spilled iron ore in and around the loading line conveyors namely conv 403, conv 404, tripper 405, vibratory feeder 406/a to f, conv 407/a to f and conv 408/a to f of loading plant for a period of 10 months in fy 2025-26
Cleaning of spilled iron ore in and around the loading line conveyors namely conv 403, conv 404, tripper 405, vibratory feeder 406/a to f, conv 407/a to f and conv 408/a to f of loading plant for a period of 10 months in fy 2025-26
Read moreof your Industry type